WELL · 42-485-45896 · DISTRICT 9

East Pinnacle Unit #186

Y

Wichita County · K-M-A field · Shut IN  · Vertical

East Pinnacle Unit #186 (API 42-485-45896) is a well in Wichita County operated by R2q Operating LLC, completed December 18, 2015 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued November 10, 2015, permitted to 5,000 ft.

It was permitted by Texas Energy Operations, LC and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Tannehill, Cisco, Thomas Sand, Gunsight.

Its lease has reported 90.7K barrels of oil and 680 mcf of gas since January 1993, last reporting in July 2026. The lease carries 29 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

R2Q Operating LLC

Permitted by Texas Energy Operations, LC; the EWA schedule now lists a different operator.

Iowa Park, TX · P-5 Y, filed Jul 4, 2026 · 38 permits on file · (940) 733-8152

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsR2Q Operating LLCthrough Feb 2026
Latest permitTexas Energy Operations, LCNov 10, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
1
permits on file
Nov 10, 2015
last permit issued
Dec 18, 2015
completed
90.7K
cumulative oil, bbl
680
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 18, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East Pinnacle Unit O-13-13829K-M-AR2Q Operating LLC2990.7K680Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,191 · prior 12 1,259(-5%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Holliday CSG Corp.Jan 1993 → Aug 2000
  2. 2Kohout, JanSep 2000 → Jan 2003
  3. 3Statia Enterprises, IncJun 2003 → Aug 2008
  4. 4Texas Energy Operations, LCSep 2008 → Dec 2019
  5. 5R2Q Operating LLCJan 2020 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
811621-99DrillTexas Energy Operations, LCOct 29, 2015Nov 10, 2015Nov 21, 20155,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-13829————

Formation tops

As filed on W-2/G-1. Subsea from 974 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill1,010-36
Cisco1,315-341
Thomas Sand1,540-566
GunsightGUNSIGHT SAND1,920-946
GunsightGUNSIGHT LIME1,940-966
CanyonCANYON SAND2,360-1,386
Bluff Creek Sand2,570-1,596
Strawn3,050-2,076
KMA3,965-2,991
Vogstberger——

Perforations

Perforated and open-hole intervals.

FromToType
4,1304,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6258412.25140 S
5.54,3357.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2016Jan 8, 2016—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
162K
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113199H-1 InjectionActive1,6002,0504,100–4,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48545896, documented in the API reference.