WELL · 42-485-45911 · DISTRICT 9

Temple #1

Plugged

Wichita County · Wichita County Regular field  · Vertical

Temple #1 (API 42-485-45911) is a plugged well in Wichita County, plugged February 9, 2026, last operated by Fullspike Energy LLC.

The RRC has issued one drilling permit, issued January 12, 2016, permitted to 1,999 ft.

It was permitted by Rwa, LLC and has since transferred to Fullspike Energy LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Bluff Creek Sand, Canyon, Cisco, Gunsight.

Its 2 leases have reported 1.1K barrels of oil since February 2013, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Fullspike Energy LLC

Permitted by Rwa, LLC; the EWA schedule now lists a different operator.

Boyd, TX · P-5 Y, filed Dec 4, 2025 · 3 permits on file · (817) 312-1142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFullspike Energy LLC
Production reportsGGP Exploration, Ltd.through Dec 2021
Latest permitRwa, LLCJan 12, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Jan 12, 2016
last permit issued
Mar 20, 2016
completed
1.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 20, 2016
Shut in
—
Plugged
Feb 9, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
N. R. Temple O-13-32466Wichita County RegularGGP Exploration, Ltd.41.1K0Feb 2013 – Jul 2026
Temple O-13-33631Wichita County RegularFullspike Energy LLC100Mar 2016 – Nov 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rwa, LLCJan 2014 → Apr 2021
  2. 2Rock Energy Resources, LLCOct 2014 → Mar 2016
  3. 3Fullspike Energy LLCApr 2016 → Aug 2019
  4. 4GGP Exploration, Ltd.Aug 2021 → Dec 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
813160-99DrillRwa, LLCJan 12, 2016Jan 12, 2016Feb 8, 20161,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-32466————
—— O-13-33631————

Formation tops

As filed on W-2/G-1. Subsea from 1,004 ft elevation.Download CSV →

FormationMD ftSubsea
Bluff Creek Sand——
CanyonCANYON SAND——
Cisco——
GunsightGUNSIGHT LIME——
GunsightGUNSIGHT SAND——
KMA——
Strawn——
Tannehill——
Thomas Sand——
Vogstberger——

Perforations

Perforated and open-hole intervals.

FromToType
1,8601,930Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,9276.75300 S
4.51,9316.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 6, 2018Oct 13, 2017—
00May 31, 2017Sep 13, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.45K
bbl, last 12 reported months
41.6K
bbl, all reported
May 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114345H-1 InjectionPlugged Feb 23, 20264009301,860–1,930

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,450 · prior 12 1,000(+145%)

05001K20202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48545911, documented in the API reference.