TEXAS · WELLS · WICHITA COUNTY · API 42-485-91585 · DISTRICT 7C

Kma Waterflood-Southwest Unit #160

Y

Wichita County · K-M-A field · Producing  · Vertical

Kma Waterflood-Southwest Unit #160 (API 42-485-91585) is a well in Wichita County operated by Stephens & Johnson Operating CO., completed September 16, 1994 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1981 and 1994, permitted to 4,416 ft.

Its 2 leases have reported 5.28M barrels of oil and 38 mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 163 wells, so these are lease totals, not this well alone.

Operator of record

Stephens & Johnson Operating Co.

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
360
Phone
(940) 723-2166

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStephens & Johnson Operating Co.
Production reportsStephens & Johnson Operating Co.through Apr 2026
Latest permitStephens & Johnson Operating Co.Sep 21, 1994
4,416
total depth, ft
2
permits on file
Sep 21, 1994
last permit issued
Sep 16, 1994
completed
5.28M
cumulative oil, bbl
38
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 16, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 163 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kma Waterflood-Southwest Unit O-13-10267K-M-AStephens & Johnson Operating Co.1605.27M19Jan 1993 – Apr 2026
Griffin, N. C. O-13-17431K-M-A (Ellenburger)Stephens & Johnson Operating Co.33.93K19Jan 1993 – Aug 1994

Oil, barrels lease total

Last 12 months 113,507 · prior 12 119,611(-5%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1S & J Operating Co.Jan 1993 → Aug 1993
  2. 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
428114-99RecompletionStephens & Johnson Operating Co.Sep 16, 1994Sep 21, 1994Aug 31, 19944,416
146056-99OtherShell Oil CompanyDec 29, 1981Dec 29, 1981—4,416

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 16, 1994Kma Waterflood-Southwest Unit O-13-10267K-M-AStephens & Johnson Operating Co.Producing4,416
May 28, 1981Griffin N. C. O-13-17431K-M-A (Ellenburger)Stephens & Johnson Operating Co.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
3,8723,880Perforated
3,9143,946Perforated
3,9804,000Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510312.550 S
8.625103—50 S
2.8752,010——
5.54,3517.875300 S
5.54,351—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 20, 1994Oct 4, 1994Yes
00Oct 10, 1994——
00Jan 12, 1984Jan 18, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48591585, documented in the API reference.