TEXAS · WELLS · WILBARGER COUNTY · WAGGONER -BE- LEASE · API 42-487-30970 · DISTRICT 7C
Waggoner -BE- #14
Wilbarger County · Wilbarger County Regular field · Vertical
Waggoner -BE- #14 (API 42-487-30970) is a plugged well in Wilbarger County, plugged July 3, 1990, last operated by Burk Royalty CO. Ltd..
The RRC has issued one drilling permit, issued July 18, 1977, permitted to 1,200 ft.
It was permitted by Johnson, F. T., JR. and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.
Operator of record
Permitted by Johnson, F. T., Jr.; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 4, 2025
- Permits on file
- 384
- Phone
- (940) 397-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Co. Ltd. |
| Production reports | none |
| Latest permit | Johnson, F. T., Jr.Jul 18, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,200
- total depth, ft
- 1
- permits on file
- Jul 18, 1977
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jul 3, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 15 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Waggoner -BE- O-13-13876 | Wilbarger County Regular | Burk Royalty Co., Ltd. | 15 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 3270-99 | Drill | Johnson, F. T., Jr. | Jul 18, 1977 | Jul 18, 1977 | — | 1,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Waggoner -BE- O-13-13876 | Wilbarger County Regular | Burk Royalty Co. Ltd. | Plugged | — |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 60 | 8.75 | 15 S |
| 2 | 1,010 | — | — |
| 4.5 | 1,151 | 6.25 | 30 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 29, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-487-30970 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-487-30970 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 8.68K
- bbl, last 12 reported months
- 14.3K
- bbl, all reported
- Oct 1984
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000036620 | H-1 Injection | Plugged Jul 31, 1990 | 150 | 1,100 | 1,106–1,116 |
MONTHLY INJECTED, BBL · H-10 · LAST 14 REPORTED MONTHS
Last 12 months 8,680
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48730970, documented in the API reference.