WELL · 42-487-32046 · DISTRICT 9
Wallingford #1068
Wilbarger County · Wilbarger County Regular field · Vertical
Wallingford #1068 (API 42-487-32046) is a plugged well in Wilbarger County, plugged July 18, 1991, last operated by Wharton Oil CO..
The RRC has issued one drilling permit (amended twice), issued April 20, 1987, permitted to 9,000 ft.
It was permitted by Elwood Company and has since transferred to Wharton Oil CO. on the wellbore schedule.
Completion filings report 5 formation tops, including Canyon, Palo Pinto, B/Penn, Barnett.
Operator of record
Permitted by Elwood Company; the EWA schedule now lists a different operator.
Vernon, TX · P-5 Y, filed Sep 3, 1994 · 40 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wharton Oil Co. |
| Production reports | none |
| Latest permit | Ford, Don H. & Assoc.Apr 20, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 3
- permits on file
- Apr 20, 1987
- last permit issued
- Sep 1, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 1, 1987
- Shut in
- —
- Plugged
- Jul 18, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-13-26962 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 329188-97 | Drill | Elwood Company | Feb 10, 1988 | Apr 20, 1987 | — | 9,000 |
| 329188-98 | Drill | Elwood Company | Apr 28, 1987 | Apr 20, 1987 | — | 9,000 |
| 329188-99 | Drill | Ford, Don H. & Assoc. | Apr 20, 1987 | Apr 20, 1987 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26962 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,246 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 4,250 | -3,004 |
| Palo Pinto | 5,020 | -3,774 |
| B/Penn | 7,200 | -5,954 |
| Barnett | 7,530 | -6,284 |
| EllenburgerELLENBERGER | 8,170 | -6,924 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,315 | 7,318 | Perforated |
| 7,320 | 7,325 | Perforated |
| 7,428 | 7,436 | Perforated |
| 7,438 | 7,448 | Perforated |
| 7,485 | 7,489 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 335 | 12.25 | 200 S |
| 5.5 | 8,241 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 1988 | Jan 27, 1988 | Yes |
| 00 | Mar 4, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-487-32046 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-487-32046 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48732046, documented in the API reference.