WELL · 42-487-32982 · DISTRICT 9

Wallingford #1H

Y

Wilbarger County · Premonition (Barnett Shale) field · Producing  · Horizontal

Wallingford #1H (API 42-487-32982) is a horizontal well in Wilbarger County operated by Numar Oil And Gas Corporation, completed May 4, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 10, 2014, permitted to 9,000 ft.

It was permitted by Anschutz Exploration Corporation and has since transferred to Numar Oil And Gas Corporation on the wellbore schedule.

Completion filings report 10 formation tops, including Coleman Junction, King, Dyson Sand, Milham Sand.

Its lease has reported 98.1K barrels of oil and 91.9K mcf of gas since May 2014, last reporting in July 2026.

Operator of record

Numar Oil and Gas Corporation

Permitted by Anschutz Exploration Corporation; the EWA schedule now lists a different operator.

Sante FE, NM · P-5 Y, filed Jan 5, 2026 · 2 permits on file · (505) 690-6354

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNumar Oil and Gas Corporation
Production reportsNumar Oil and Gas Corporationthrough Apr 2026
Latest permitAnschutz Exploration CorporationJan 10, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Jan 10, 2014
last permit issued
May 4, 2014
completed
98.1K
cumulative oil, bbl
91.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 4, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wallingford O-13-33046Premonition (Barnett Shale)Numar Oil and Gas Corporation198.1K91.9KMay 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 3,070 · prior 12 2,626(+17%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anschutz Exploration CorporationMay 2014 → Feb 2016
  2. 2GBF Operating LLCMar 2016 → Mar 2016
  3. 3Numar Oil and Gas CorporationApr 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
776369-99DrillAnschutz Exploration CorporationDec 30, 2013Jan 10, 2014Jan 30, 20149,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-33046————

Formation tops

As filed on W-2/G-1. Subsea from 1,222 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE ZON400822
King1,784-562
Dyson Sand2,005-783
Milham Sand2,375-1,153
Cisco2,417-1,195
Canyon3,848-2,626
KMA4,060-2,838
Chappel——
Ellenburger——
Simpson——

Perforations

Perforated and open-hole intervals.

FromToType
7,99011,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,51113.51,055 S
7.6257,8979.875305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 2014Sep 22, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48732982, documented in the API reference.