WELL · 42-487-32991 · DISTRICT 9

Waggoner-Epco C #6301

Y

Wilbarger County · Megargel (Caddo) field · Injection  · Vertical

Waggoner-Epco C #6301 (API 42-487-32991) is a well in Wilbarger County operated by Dry Fork Production CO. LLC, completed July 12, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued February 28, 2014, permitted to 6,500 ft.

It was permitted by Five States Operating CO, LLC and has since transferred to Dry Fork Production CO. LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Coleman Junction, Dyson Sand, Cisco, Canyon.

Its lease has reported 1.6K barrels of oil since January 2015, last reporting in July 2026.

It holds an active disposal or injection permit, with 36.5K barrels injected in the 12 months reported through January 2026.

Operator of record

Dry Fork Production Co. LLC

Permitted by Five States Operating Co, LLC; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 207 permits on file · (940) 704-7200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDry Fork Production Co. LLC
Production reportsDry Fork Production Co., LLCthrough Apr 2017
Latest permitFive States Operating Co, LLCFeb 28, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
3
permits on file
Feb 28, 2014
last permit issued
Jul 12, 2017
completed
1.6K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner-Epco C O-13-33244Megargel (Caddo)Dry Fork Production Co., LLC11.6K0Jan 2015 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Five States Operating Co, LLCFeb 2015 → Nov 2016
  2. 2Dry Fork Production Co., LLCJan 2017 → Apr 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
779167-97DrillFive States Operating Co, LLCJun 25, 2015Feb 28, 2014Mar 10, 20145,000
779167-98DrillFive States Operating Co, LLCMar 4, 2014Feb 28, 2014Mar 10, 20146,500
779167-99DrillFive States Operating Co, LLCFeb 6, 2014Feb 28, 2014—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-33244————

Formation tops

As filed on W-2/G-1. Subsea from 1,231 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE ZON1,262-31
Dyson Sand1,766-535
Cisco2,490-1,259
Canyon3,130-1,899
CanyonCANYON LIME3,130-1,899
Palo3,594-2,363
Palo Pinto3,594-2,363
Strawn3,872-2,641
Caddo4,110-2,879
Canyon——
Cisco——
Coleman JunctionCOLEMAN JUNCTION - CORROSIVE ZON——
Dyson Sand——
King——
KMA——
Milham Sand——
Palo Pinto——

Perforations

Perforated and open-hole intervals.

FromToType
3,1783,190Perforated
3,2203,250Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516012.25125 S
5.54,8937.875500 S
5.54,9237.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 2017Aug 23, 2017—
00Jul 23, 2015Mar 3, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

36.5K
bbl, last 12 reported months
286K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115109H-1 InjectionActive7501,5803,170–3,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 36,533 · prior 12 36,500(+0%)

02K4K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48732991, documented in the API reference.