TEXAS · WELLS · WILLACY COUNTY · API 42-489-00050 · DISTRICT 04

Yturria L&L Co -a- NCT-1 #14H

Plugged

Willacy County · Raymondville (6750) field  · Vertical

Yturria L&L CO -A- Nct-1 #14H (API 42-489-00050) is a plugged well in Willacy County, plugged August 12, 1992, last operated by Texaco E & P Inc..

The RRC has issued 10 drilling permits between 1977 and 1984, permitted to 8,200 ft.

It was permitted by Texaco Inc. and has since transferred to Texaco E & P Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Miocene (undifferentiated), Anahuac, Top Of Marginulina, Frio.

Operator of record

Texaco E & P Inc.

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Jan 22, 2003
Permits on file
3,332
Phone
(281) 561-3713

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTexaco Inc.Jul 30, 1984
8,200
total depth, ft
10
permits on file
Jul 30, 1984
last permit issued
Aug 22, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 22, 1984
Shut in
—
Plugged
Aug 12, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Yturria L&L Co.-a- NCT 1 O-4-10175Raymondville (A-13)Texaco E & P Inc.200Jan 1993 – May 1994
— G-4-71879——000—
— G-4-91093——000—
— G-4-112592——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
246634-99RecompletionTexaco Inc.Sep 17, 1984Jul 30, 1984—8,200
229109-99RecompletionTexaco Inc.Apr 11, 1984Feb 10, 1984—8,200
186444-99RecompletionTexaco Inc.Feb 18, 1983Feb 18, 1983—8,200
182991-99RecompletionTexaco Inc.Dec 31, 1982Dec 31, 1982—8,200
95556-99RecompletionTexaco Inc.Oct 14, 1980Oct 14, 1980—8,200
56144-99RecompletionTexaco Inc.Aug 21, 1979Aug 21, 1979—8,200
38808-99RecompletionTexaco Inc.Dec 13, 1978Dec 13, 1978—8,200
20216-99RecompletionTexaco Inc.Mar 16, 1978Mar 16, 1978—8,200
11754-99RecompletionTexaco Inc.Nov 8, 1977Nov 8, 1977—8,200
9934-99RecompletionTexaco Inc.Oct 17, 1977Oct 17, 1977—8,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 22, 1984Yturria L&L Co -a- NCT-1 G-4-112592Raymondville (6750)Texaco E & P Inc.Plugged—
Mar 10, 1984Yturria L&L Co. -a- NCT-1 G-4-110007Raymondville (A-13)Texaco Inc.Plugged—
Mar 9, 1983Yturria L&L Co.-a- NCT-1 G-4-104343Raymondville (F- 2)Texaco Inc.Plugged—
Feb 12, 1983Yturria L&L Co-A-NCT-1 G-4-104052Raymondville (F- 5)Texaco Inc.Plugged—
Feb 12, 1983Yturria L&L Co.-a- NCT 1 O-4-10175Raymondville (A-13)Texaco E & P Inc.Plugged—
Oct 15, 1980Yturria L & L Co a NCT-1 G-4-91093Raymondville (a-2 North)Texaco E & P Inc.Plugged—
Sep 2, 1979Yturria L&L Co a NCT-1 G-4-85166Raymondville (A-15)Texaco Inc.Plugged—
Jan 9, 1979Yturria L&L Co. a NCT-1 G-4-80281Raymondville (F- 3)Texaco Inc.Plugged—
Jun 7, 1977Yturria L&L Co -a- NCT-1 G-4-71879Raymondville (A-12)Texaco E & P Inc.Plugged—
Jan 1, 1977Yturria L&L Co. -a- NCT-1 G-4-69870Raymondville (F-7)Texaco Inc.Plugged—
Apr 1, 1974Yturria L&L Co.-A-NCT-1 G-4-58721Raymondville (F- 9)Texaco Inc.Plugged—
Dec 1, 1967— G-4-12767Raymondville (F-15)Texaco Inc.Plugged—
Dec 1, 1962— G-4-12760Raymondville (F- 2)Texaco Inc.Plugged—
Nov 1, 1962Yturria L & L Co. -a- NCT-1 G-4-12763Raymondville (F- 8)Texaco Inc.Plugged—
—Yturria L & L Co. -a- NCT-1 G-4-46747Raymondville (F-12-A)Texaco Inc.Plugged—
—Yturria L & L Co. -A- G-4-74085Raymondville (F- 6)Texaco Inc.Plugged—
—Yturria L & L Co. -a- NCT-1 G-4-71560Raymondville (F-4)Texaco Inc.Plugged—
—Yturria L & L Co. -a- NCT-1 G-4-50350Raymondville (A-16)Texaco Inc.Plugged—
—Yturria L & L -A- NCT - 1 G-4-71067Raymondville (A-13)Texaco Inc.Plugged—
—Yturria L&L Co. a NCT 1 G-4-78357Raymondville (A-5A)Texaco Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 26 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)LOWER MIOCENE5,700-5,674
Anahuac5,900-5,874
Top of Marginulina6,700-6,674
FrioTOP OF FRIO6,950-6,924

Perforations

Perforated and open-hole intervals.

FromToType
5,8015,805Perforated
6,4626,465Perforated
6,4886,492Perforated
6,6146,618Perforated
6,6746,678Perforated
6,7206,724Perforated
6,7326,741Perforated
6,9646,969Perforated
6,9656,969Perforated
7,0747,087Perforated
7,3147,319Perforated
7,4367,444Perforated
7,5147,516Perforated
7,5877,591Perforated
7,9687,074Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,17715450 S
10.751,17815450 S
2.8758,1829.875865 S
2.8758,182——
2.8758,1989.875—
2.8758,198——
2.8758,1999.875—
2.8758,199——
2.8758,200—865 S
2.8758,2009.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 1986Apr 15, 1986Yes
00Apr 25, 1986——
00Oct 30, 1984Sep 19, 1984Yes
00Oct 2, 1984Aug 22, 1984—
00May 10, 1984Apr 5, 1984—
00Apr 28, 1984Apr 5, 1984—
00Jan 12, 1984Mar 22, 1983—
00Jan 12, 1984Mar 3, 1983—
00Jan 12, 1984Nov 3, 1980—
00Jan 12, 1984Sep 21, 1979—
00Jan 12, 1984Jan 23, 1979—
00Jan 12, 1984Aug 11, 1969—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48900050, documented in the API reference.