TEXAS · WELLS · WILLACY COUNTY · API 42-489-30604 · DISTRICT 04

Bell S.H. B #5

Plugged

Willacy County · Willamar (Graben 6140) field  · Vertical

Bell S.H. B #5 (API 42-489-30604) is a plugged well in Willacy County, plugged August 7, 1992, last operated by Exxon Corp..

The RRC has issued 6 drilling permits between 1979 and 1992, permitted to 8,230 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Feb 14, 1992
8,230
total depth, ft
6
permits on file
Feb 14, 1992
last permit issued
Mar 4, 1992
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 4, 1992
Shut in
—
Plugged
Aug 7, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-4-87442——000—
— G-4-105771——000—
— G-4-141154——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
396566-99RecompletionExxon Corp.Feb 10, 1992Feb 14, 1992Feb 27, 19927,906
325217-99RecompletionExxon Corp.Jan 8, 1987Jan 12, 1987—7,906
269977-99RecompletionExxon Corp.Mar 18, 1985Mar 19, 1985—7,906
232111-99RecompletionExxon Corp.Mar 9, 1984Mar 12, 1984—7,906
183001-99RecompletionExxon Corp.Dec 31, 1982Dec 31, 1982—8,230
54792-99DrillExxon Corp.Aug 7, 1979Aug 7, 1979Aug 21, 19798,230

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 4, 1992Bell S.H. B G-4-141154Willamar (Graben 6140)Exxon Corp.Plugged—
Jul 15, 1987Bell S.H. B G-4-105771Willamar (Graben 5800)Exxon Corp.Plugged—
Jul 15, 1987Bell S.H. B G-4-105771Willamar (Graben 5800)Exxon Corp.Plugged—
Jun 11, 1987Bell S.H. B G-4-87442Willamar (Graben 5100)Exxon Corp.Plugged—
Jun 11, 1987Bell S.H. B G-4-87442Willamar (Graben 5100)Exxon Corp.Plugged—
Jun 11, 1987Bell S.H. B G-4-87442Willamar (Graben 5100)Exxon Corp.Plugged—
Jun 11, 1987Bell S.H. B G-4-87442Willamar (Graben 5100)Exxon Corp.Plugged—
—Bell S.H. B G-4-86145Willamar (Miocene)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,1505,156Perforated
5,5735,576Perforated
5,8805,888Perforated
5,9465,952Perforated
6,1356,138Perforated
6,3716,375Perforated
7,2247,228Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,62512.25865 S
2.8757,882——
2.8757,8837.8751,000 S
2.8757,883——
2.8757,9007.8751,000 S
2.8757,9017.8751,000 S
2.8757,901——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 8, 1992Mar 24, 1992Yes
00Apr 29, 1992——
00Aug 19, 1987Jul 29, 1987Yes
00Dec 23, 1985Dec 9, 1985—
00Feb 22, 1985Feb 6, 1985—
00Jan 12, 1984May 18, 1983—
00Jan 12, 1984Apr 8, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930604, documented in the API reference.