TEXAS · WELLS · WILLACY COUNTY · THOMAS, M.G. ET AL LEASE · API 42-489-30925 · DISTRICT 04

Thomas M.G. et Al #2

Plugged

Willacy County · Tordilla (M-50 E) field  · Vertical

Thomas M.G. ET AL #2 (API 42-489-30925) is a plugged well in Willacy County, plugged November 14, 2006, last operated by Exxon Mobil Corporation.

The RRC has issued one drilling permit, issued January 4, 1990, permitted to 15,300 ft.

It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Fleming, Anahuac, Frio.

Its lease has reported 3.26M mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Exxon Mobil Corporation

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 15, 2026
Permits on file
1,223
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Mobil Corporation
Production reportsExxon Mobil Corporationthrough Mar 2006
Latest permitExxon Corp.Jan 4, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,300
total depth, ft
1
permits on file
Jan 4, 1990
last permit issued
Dec 14, 2000
completed
0
cumulative oil, bbl
3.26M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 14, 2000
Shut in
—
Plugged
Nov 14, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomas, M.G. et Al G-4-134952Tordilla (M-50,E)Exxon Mobil Corporation103.26MJan 1993 – Mar 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Mar 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
368207-99DrillExxon Corp.Jan 3, 1990Jan 4, 1990—15,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 14, 2000Thomas M.G. et Al G-4-134952Tordilla (M-50 E)Exxon Mobil CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 77 ft elevation.Download CSV →

FormationMD ftSubsea
Fleming3,600-3,523
Anahuac5,800-5,723
Frio6,220-6,143

Perforations

Perforated and open-hole intervals.

FromToType
12,50812,881Perforated
13,28013,344Perforated
13,28013,367Perforated
13,34813,356Perforated
13,36113,367Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,60617.52,179 S
9.62510,54812.252,235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 22, 2001Feb 27, 2001—
00Aug 3, 1990Jun 21, 1990Yes
00Jul 4, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48930925, documented in the API reference.