WELL · 42-489-30980 · DISTRICT 4
Corbett Fryer Dobbin Unit #1
Willacy County · LA Sal Vieja (9 9935-10000) field · Vertical
Corbett Fryer Dobbin Unit #1 (API 42-489-30980) is a plugged well in Willacy County, plugged November 19, 2003, last operated by Wynn-Crosby Energy Inc..
The RRC has issued one drilling permit (amended once), issued May 24, 1996, permitted to 10,500 ft.
It was permitted by National Energy Group, Inc. and has since transferred to Wynn-Crosby Energy Inc. on the wellbore schedule.
Operator of record
Permitted by National Energy Group, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 1, 2005
- Permits on file
- 117
- Phone
- (832) 204-2710
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wynn-Crosby Energy Inc. |
| Production reports | Wynn-Crosby Energy, Inc.through Dec 2002 |
| Latest permit | National Energy Group, Inc.May 24, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 2
- permits on file
- May 24, 1996
- last permit issued
- Aug 25, 1996
- completed
- 0
- cumulative oil, bbl
- 1.75M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1996 THROUGH Nov 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 25, 1996
- Shut in
- —
- Plugged
- Nov 19, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Corbett Fryer Dobbin Unit G-4-160448 | LA Sal Vieja (9 9935-10000) | Wynn-Crosby Energy, Inc. | 1 | 0 | 1.75M | Aug 1996 – Nov 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1National Energy Group, Inc.Oct 1996 → Nov 1999
- 2Wynn-Crosby Energy, Inc.Dec 1999 → Dec 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 448347-98 | Drill | National Energy Group, Inc. | Sep 11, 1996 | May 24, 1996 | Jul 16, 1996 | 10,500 |
| 448347-99 | Drill | National Energy Group, Inc. | May 21, 1996 | May 24, 1996 | — | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-160448 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,936 | 9,945 | Perforated |
| 9,954 | 9,958 | Perforated |
| 9,964 | 9,968 | Perforated |
| 9,970 | 9,976 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,499 | 14.75 | 1,025 S |
| 7.625 | 9,598 | 8.75 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 1, 2002 | May 6, 2002 | — |
| 00 | Nov 25, 1996 | Oct 23, 1995 | Yes |
| 00 | Nov 12, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-489-30980 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-489-30980 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48930980, documented in the API reference.