TEXAS · WELLS · WILSON COUNTY · API 42-493-30837 · DISTRICT 01
Ocker D.A. & R.L. #1
Wilson County · Marcelina Creek (Austin Chalk) field · Vertical
Ocker D.A. & R.L. #1 (API 42-493-30837) is a plugged well in Wilson County, plugged March 31, 1987, last operated by Baylor Operating LLC.
The RRC has issued 3 drilling permits between 1981 and 1983, permitted to 9,500 ft.
It was permitted by Exxon Corp. and has since transferred to Baylor Operating LLC on the wellbore schedule.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- San Antonio, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Feb 26, 2024
- Permits on file
- 1
- Phone
- (512) 733-1311
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Baylor Operating LLC |
| Production reports | none |
| Latest permit | Exxon Corp.Jun 14, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 3
- permits on file
- Jun 14, 1983
- last permit issued
- Oct 15, 1982
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 15, 1982
- Shut in
- —
- Plugged
- Mar 31, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 198126-99 | Recompletion | Exxon Corp. | Jun 14, 1983 | Jun 14, 1983 | — | 8,515 |
| 165264-99 | Recompletion | Exxon Corp. | Jun 30, 1982 | Jun 30, 1982 | — | 9,500 |
| 106458-99 | Drill | Exxon Corp. | Jan 27, 1981 | Jan 27, 1981 | Feb 4, 1981 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 15, 1982 | Ocker D.A. & R.L. O-1-7602 | Marcelina Creek (Austin Chalk) | Baylor Operating LLC | Plugged | — |
| May 17, 1981 | Ocker D.A. & R.L O-1-7047 | Marcelina Creek (Buda) | Baylor Operating LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,190 | 8,313 | Perforated |
| 8,415 | 8,456 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,760 | 12.25 | 1,560 S |
| 2.875 | 7,475 | — | — |
| 2.875 | 7,553 | — | — |
| 5.5 | 8,380 | 7.875 | 825 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jun 8, 1981 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-30837 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-30837 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49330837, documented in the API reference.