WELL · 42-493-31125 · DISTRICT 1

Reed D.P. #1

N

Wilson County · Cindy Ann (Austin Chalk Oil) field  · Vertical

Reed D.P. #1 (API 42-493-31125) is a well in Wilson County operated by Nordstrand Engineering Inc., completed July 24, 1982.

The RRC has issued one drilling permit, issued June 15, 1982, permitted to 6,100 ft.

It was permitted by Mark IV Energy and has since transferred to Nordstrand Engineering Inc. on the wellbore schedule.

Completion filings report 8 formation tops, including Carrizo, Bartosh, Wilcox, Poth.

Its 3 leases have reported 1.8K barrels of oil and 208K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Nordstrand Engineering Inc.

Permitted by Mark IV Energy; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 3, 2025
Permits on file
7
Phone
(713) 520-1555

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNordstrand Engineering Inc.
Production reportsNordstrand Engineering, Inc.through Oct 2020
Latest permitMark IV EnergyJun 15, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Jun 15, 1982
last permit issued
Jul 24, 1982
completed
1.8K
cumulative oil, bbl
208K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 24, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reed, D. P. G-1-222595Cindy Ann (Austin Chalk)Northern Pacific Oil Incorporatd1063.3KSep 2006 – Jul 2026
Reed, D.P. O-1-13926Cindy Ann (Austin Chalk, Oil)Nordstrand Engineering, Inc.11.8K102KDec 1994 – Mar 2009
Reed, D. P. G-1-101430Cindy Ann (Austin Chalk)M IV Ops., Inc.1042.8KJan 1993 – May 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mark IV EnergyJan 1993 → Apr 1993
  2. 2M IV Ops., Inc.May 1993 → Sep 1997
  3. 3Ress Production Co.Jun 1998 → Jul 1999
  4. 4Battlecat Operating Company, LLCAug 2000 → Dec 2005
  5. 5Nordstrand Engineering, Inc.Jan 2006 → Oct 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
165945-99DrillMark IV EnergyJun 15, 1982Jun 15, 1982—6,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-101430————
—— G-1-222595————
—— O-1-13926————

Formation tops

As filed on W-2/G-1. Subsea from 456 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo975-519
Bartosh2,275-1,819
WilcoxBASE WILCOX3,440-2,984
Poth3,590-3,134
Lit4,815-4,359
Chalk5,760-5,304
Reef5,780-5,324
Eagle FordBASE EAGLEFORD6,000-5,544

Perforations

Perforated and open-hole intervals.

FromToType
5,7855,799Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62576612.25—
2.3755,675——
5.56,0007.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 28, 2007Nov 20, 2006—
00Dec 4, 2006——
00Feb 24, 1995Dec 12, 1994—
00Dec 13, 1994——
00Jan 12, 1984Aug 9, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49331125, documented in the API reference.