WELL · 42-493-32238 · DISTRICT 1
Weber Unit #1
Wilson County · Nixon field · Vertical
Weber Unit #1 (API 42-493-32238) is a plugged well in Wilson County, plugged March 1, 1996, last operated by Burk Royalty Company.
The RRC has issued one drilling permit (amended once), issued October 3, 1990, permitted to 5,400 ft.
Completion filings report 4 formation tops, including Navarro, Taylor, Anacacho, Austin Chalk.
Its 2 leases have reported 1.55K barrels of oil and 21 mcf of gas since January 1993, last reporting in June 1996.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 12, 2001
- Permits on file
- 552
- Phone
- (940) 397-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Company |
| Production reports | Burk Royalty Companythrough Jan 1996 |
| Latest permit | Burk Royalty CompanyOct 3, 1990 |
- 5,400
- total depth, ft
- 2
- permits on file
- Oct 3, 1990
- last permit issued
- Feb 15, 1991
- completed
- 1.55K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 15, 1991
- Shut in
- —
- Plugged
- Mar 1, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Weber Unit O-1-13507 | Nixon | Burk Royalty Company | 1 | 1.55K | 21 | Jan 1993 – Jun 1996 |
| — G-1-137790 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burk Royalty CompanyJan 1993 → Jan 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 378700-98 | Drill | Burk Royalty Company | Jan 22, 1991 | Oct 3, 1990 | — | 5,400 |
| 378700-99 | Drill | Burk Royalty Company | Oct 1, 1990 | Oct 3, 1990 | Jan 15, 1991 | 5,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-137790 | — | — | — | — |
| — | — O-1-13507 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 489 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 3,605 | -3,116 |
| Taylor | 4,391 | -3,902 |
| Anacacho | 4,915 | -4,426 |
| Austin Chalk | 5,060 | -4,571 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,002 | 5,082 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,440 | 12.25 | 690 S |
| 5.5 | 5,002 | 7.875 | 535 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 26, 1992 | Apr 27, 1992 | — |
| 00 | May 11, 1992 | — | — |
| 00 | Aug 13, 1991 | Apr 5, 1991 | Yes |
| 00 | Apr 26, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32238 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32238 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332238, documented in the API reference.