WELL · 42-493-32664 · DISTRICT 1

Sekula A #1H

Y

Wilson County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Sekula A #1H (API 42-493-32664) is a horizontal well in Wilson County operated by Warwick-Artemis LLC, completed November 21, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 29, 2012, permitted to 18,000 ft.

It was permitted by Hunt Oil Company and has since transferred to Warwick-Artemis LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Navarro, Olmos, Anacacho, Austin Chalk.

Its lease has reported 790K barrels of oil and 447K mcf of gas since November 2012, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Warwick-Artemis LLC

Permitted by Hunt Oil Company; the EWA schedule now lists a different operator.

Based in
Nichols Hill, OK
P-5 status
Active (A)
P-5 last filed
Jul 29, 2025
Permits on file
118
Phone
(405) 607-3400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWarwick-Artemis LLC
Production reportsWarwick-Artemis, LLCthrough Apr 2026
Latest permitHunt Oil CompanyJun 29, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

18,000
total depth, ft
1
permits on file
Jun 29, 2012
last permit issued
Nov 21, 2012
completed
790K
cumulative oil, bbl
447K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 21, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sekula A O-1-16672Eagleville (Eagle Ford-1)Warwick-Artemis, LLC4790K447KNov 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 74,898 · prior 12 87,893(-15%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 29,586 · prior 12 41,894(-29%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Oil CompanyNov 2012 → Apr 2018
  2. 2Recoil Resources Operating, Inc.May 2018 → Mar 2024
  3. 3Warwick-Artemis, LLCApr 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
743308-99DrillHunt Oil CompanyJun 21, 2012Jun 29, 2012Jul 25, 201218,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-16672————

Formation tops

As filed on W-2/G-1. Subsea from 355 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro6,320-5,965
Olmos6,955-6,600
Anacacho7,875-7,520
Austin Chalk8,027-7,672
Eagle Ford8,372-8,017

Perforations

Perforated and open-hole intervals.

FromToType
8,83616,805Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37558117720 S
9.6255,99312.251,150 S
5.58,5068.52,360 S
4.516,8778.52,360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 17, 2013Mar 5, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49332664, documented in the API reference.