WELL · 42-493-32762 · DISTRICT 1
Lang Unit #1H
Wilson County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Lang Unit #1H (API 42-493-32762) is a horizontal well in Wilson County operated by Eog Resources Inc., completed April 30, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 31, 2013, permitted to 11,000 ft.
Completion filings report 9 formation tops, including Wilcox, Navarro, Olmos, Anacacho.
Its lease has reported 289K barrels of oil and 163K mcf of gas since April 2014, last reporting in July 2026.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,348
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Apr 2026 |
| Latest permit | EOG Resources, Inc.Dec 31, 2013 |
- 11,000
- total depth, ft
- 1
- permits on file
- Dec 31, 2013
- last permit issued
- Apr 30, 2014
- completed
- 289K
- cumulative oil, bbl
- 163K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 30, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lang Unit O-1-17644 | Eagleville (Eagle Ford-1) | EOG Resources, Inc. | 1 | 289K | 163K | Apr 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 18,984 · prior 12 3,226(+488%)
Gas, mcf lease total
Last 12 months 5,929 · prior 12 6,835(-13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.May 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 775546-99 | Drill | EOG Resources, Inc. | Dec 12, 2013 | Dec 31, 2013 | Jan 31, 2014 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-17644 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxWILCOX - DISPOSAL | 3,589 | -3,273 |
| Navarro | 6,755 | -6,439 |
| Olmos | 7,505 | -7,189 |
| AnacachoANACACHO - H2S | 8,847 | -8,531 |
| Austin ChalkAUSTIN CHALK - H2S | 9,084 | -8,768 |
| Eagle FordEAGLE FORD - H2S | 9,316 | -9,000 |
| BudaBUDA - H2S | — | — |
| EdwardsEDWARDS - H2S, DISPOSAL | — | — |
| GeorgetownGEORGETOWN - H2S | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,750 | 16,391 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,500 | 12.25 | 1,685 S |
| 5.5 | 16,479 | 8.5 | 1,900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 2014 | May 19, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32762 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32762 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332762, documented in the API reference.