WELL · 42-495-03228 · DISTRICT 8
Hill M. J. #1
Winkler County · Halley (Devonian) field · Vertical
Hill M. J. #1 (API 42-495-03228) is a well in Winkler County operated by Seahawk Oil & Gas Company, completed November 21, 1956.
The RRC has issued one drilling permit, issued March 14, 1991, permitted to 3,316 ft.
Completion filings report 3 formation tops, including Queen, Glorieta, Clear Fork.
Its 2 leases have reported 15.5K barrels of oil and 36.2K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Dallas, TX · P-5 Y, filed Jan 5, 1998 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seahawk Oil & Gas Company |
| Production reports | King Oil & Resources Cothrough Mar 2025 |
| Latest permit | Seahawk Oil & Gas CompanyMar 14, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,316
- total depth, ft
- 1
- permits on file
- Mar 14, 1991
- last permit issued
- Nov 21, 1956
- completed
- 15.5K
- cumulative oil, bbl
- 36.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 21, 1956
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hill, M. J. -19- O-10-33393 | Halley, South (Queen Sand) | King Oil & Resources Co | 1 | 15.5K | 36.2K | Jan 1993 – Jul 2026 |
| — G-10-44120 | — | — | 0 | 0 | 0 | — |
Oil, barrels lease total
Last 12 months 0 · prior 12 2(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1King Oil & Resources CoJan 1993 → Mar 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 385760-99 | Recompletion | Seahawk Oil & Gas Company | Mar 14, 1991 | Mar 14, 1991 | Mar 19, 1991 | 3,316 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-44120 | — | — | — | — |
| — | — O-10-33393 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,783 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| QueenQUEEN FORMATION | 3,223 | -440 |
| GlorietaGLORIETA FORMATION | 4,920 | -2,137 |
| Clear ForkCLEARFORK FORMATION | 5,320 | -2,537 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,233 | 3,317 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 380 | 17.5 | 430 S |
| 9.625 | 4,365 | 12.25 | — |
| 9.625 | 4,366 | 12.25 | 1,200 S |
| 7 | 9,842 | 12.25 | — |
| 2.375 | 9,923 | — | — |
| 7 | 11,691 | 8.75 | 865 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1992 | Jan 17, 1992 | Yes |
| 00 | Mar 11, 1992 | — | — |
| 00 | Jan 12, 1984 | Jan 13, 1969 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-03228 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-03228 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49503228, documented in the API reference.