TEXAS · WELLS · WINKLER COUNTY · BASHARA, M. J. LEASE · API 42-495-03728 · DISTRICT 7B

Bashara M.J. #20

Plugged

Winkler County · Keystone (San Andres) field  · Vertical

Bashara M.J. #20 (API 42-495-03728) is a plugged well in Winkler County, plugged December 6, 1993, last operated by El Paso Natural Gas Company.

The RRC has issued one drilling permit, issued June 18, 1985, permitted to 9,917 ft.

It was permitted by Bass Enterprises Production CO. and has since transferred to El Paso Natural Gas Company on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Operator of record

El Paso Natural Gas Company

Permitted by Bass Enterprises Production Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 3, 2012
Permits on file
169
Phone
(713) 420-2600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBass Enterprises Production Co.Jun 18, 1985
9,917
total depth, ft
1
permits on file
Jun 18, 1985
last permit issued
Jul 1, 1974
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1974
Shut in
—
Plugged
Dec 6, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bashara, M. J. O-10-28522Keystone (San Andres)Hilcorp Energy Company700Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
278095-99RecompletionBass Enterprises Production Co.Jun 18, 1985Jun 18, 1985—9,917

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 1, 1974Bashara M.J. O-10-23222Keystone (San Andres)El Paso Natural Gas CompanyPlugged—
Jul 1, 1974Bashara M.J. O-10-23222Keystone (San Andres)El Paso Natural Gas CompanyPlugged—
—Bashara M. J. O-10-28522Keystone (San Andres)Hilcorp Energy CompanyPlugged—
—Bashara M. J. O-10-3370Keystone (Ellenburger)Hilcorp Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,974 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,615-1,641

Perforations

Perforated and open-hole intervals.

FromToType
4,6154,785Perforated
—4,918Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2025524250 S
13.37597817.25800 S
9.6255,00312750 S
79,7158.751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 16, 1986Aug 8, 1986—
00Sep 6, 1986——
00Aug 22, 1986Jun 24, 1974—
00Jan 12, 1984Jun 24, 1974—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

38.6K
bbl, last 12 reported months
464K
bbl, all reported
Jun 1985
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000016882UIC PermitPlugged Dec 20, 1993004,615–0

MONTHLY INJECTED, BBL · H-10 · LAST 16 REPORTED MONTHS

Last 12 months 38,575 · prior 12 214,897(-82%)

010K20K30K19841985

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49503728, documented in the API reference.