TEXAS · WELLS · WINKLER COUNTY · HILL, M. J. LEASE · API 42-495-05428 · DISTRICT 7B

Hill M. J. #13

Plugged

Winkler County · Halley (Devonian) field  · Vertical

Hill M. J. #13 (API 42-495-05428) is a plugged well in Winkler County, plugged June 17, 2011, last operated by Chesapeake Operating Inc..

The RRC has issued 3 drilling permits between 1980 and 1995, permitted to 9,913 ft.

It was permitted by Oryx Energy Company and has since transferred to Chesapeake Operating Inc. on the wellbore schedule.

Operator of record

Chesapeake Operating Inc.

Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Delinquent (D)
P-5 last filed
Dec 10, 2024
Permits on file
13,061
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsnone
Latest permitOryx Energy CompanyAug 23, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,913
total depth, ft
3
permits on file
Aug 23, 1995
last permit issued
Nov 6, 1957
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1957
Shut in
—
Plugged
Jun 17, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hill, M. J. G-10-44100Halley (Devonian)Chesapeake Operating, Inc.100Jan 1993 – Jun 2011

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
439252-99RecompletionOryx Energy CompanyAug 23, 1995Aug 23, 1995—3,400
386801-99RecompletionOryx Energy CompanyApr 15, 1991Apr 15, 1991—9,913
102102-99RecompletionSun Exploration & Production Co.Dec 12, 1980Dec 12, 1980—9,912

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 6, 1957Hill M. J. G-10-44100Halley (Devonian)Chesapeake Operating Inc.Plugged—

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37550417.5391 S
8.6254,231113,762 S
2.8759,029——
2.3759,849——
5.59,9137.875140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 12, 1968—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49505428, documented in the API reference.