TEXAS · WELLS · WINKLER COUNTY · DAUGHERTY-ACCT. 3 LEASE · API 42-495-05652 · DISTRICT 7B

Daugherty-Acct. 3 #39W

Plugged

Winkler County · Kermit field  · Vertical

Daugherty-Acct. 3 #39W (API 42-495-05652) is a plugged well in Winkler County, plugged January 27, 2020, last operated by Unitex Oil & Gas L.L.C..

The RRC has issued one drilling permit, issued March 31, 1992, permitted to 3,187 ft.

It was permitted by Walsh & Watts, Inc. and has since transferred to Unitex Oil & Gas L.L.C. on the wellbore schedule.

Its lease has reported 70K barrels of oil and 22.9K mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Unitex Oil & Gas L.L.C.

Permitted by Walsh & Watts, Inc.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Apr 1, 2026
Permits on file
96
Phone
(432) 685-0014

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnitex Oil & Gas L.L.C.
Production reportsUnitex Oil & Gas, L.L.C.through Apr 2026
Latest permitWalsh & Watts, Inc.Mar 31, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,187
total depth, ft
1
permits on file
Mar 31, 1992
last permit issued
Mar 8, 1992
completed
70K
cumulative oil, bbl
22.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 8, 1992
Shut in
—
Plugged
Jan 27, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Daugherty-Acct. 3 O-10-14277KermitUnitex Oil & Gas, L.L.C.1070K22.9KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,193 · prior 12 1,152(+4%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Walsh & Watts, Inc.Jan 1993 → Feb 2018
  2. 2Unitex Oil & Gas, L.L.C.Mar 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
397892-99DrillWalsh & Watts, Inc.Mar 30, 1992Mar 31, 1992Mar 7, 19923,187

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 8, 1992Daugherty-Acct. 3 O-10-14277KermitUnitex Oil & Gas L.L.C.Plugged—
—Daugherty-Acct. 3 O-10-14277KermitUnitex Oil & Gas L.L.C.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,9213,135Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62557812.25275 S
8.625578—275 S
5.53,176—150 S
5.53,1867.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 4, 1992Mar 19, 1992—
00Apr 9, 1992Dec 13, 1989—
00Jan 17, 1990Dec 13, 1989—
00Jan 12, 1984Apr 18, 1961—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
31.2K
bbl, all reported
Jun 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000016607UIC PermitPlugged Nov 29, 2021002,921–3,135

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119901991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49505652, documented in the API reference.