WELL · 42-495-05678 · DISTRICT 8

Sealy & Smith Foundation -a- 4&5 #3

Plugged

Winkler County · Halley South (Queen Sand) field  · Vertical

Sealy & Smith Foundation -A- 4&5 #3 (API 42-495-05678) is a plugged well in Winkler County, plugged January 30, 1995, last operated by R2q Operating LLC.

The RRC has issued 2 drilling permits between 1988 and 1990, permitted to 3,500 ft.

It was permitted by Sage Energy Company and has since transferred to R2q Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Queen.

Its 2 leases have reported 79K barrels of oil and 128K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

R2Q Operating LLC

Permitted by Sage Energy Company; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsExtex Operating Companythrough Apr 2026
Latest permitSage Energy CompanyJan 25, 1990
3,500
total depth, ft
2
permits on file
Jan 25, 1990
last permit issued
Feb 10, 1990
completed
79K
cumulative oil, bbl
128K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 10, 1990
Shut in
—
Plugged
Jan 30, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sealy & Smith Foundation -a- 2 O-10-16318Halley (Clear Fork)Extex Operating Company340.4K75.8KJan 1993 – Jul 2026
Sealy & Smith Foundation -a- 4&5 O-10-17170Halley, South (Queen Sand)Extex Operating Company338.7K52.6KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 699 · prior 12 749(-7%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sage Energy CompanyJan 1993 → Jul 2007
  2. 2Sheridan Production Company, LLCAug 2007 → Aug 2010
  3. 3Legacy Reserves Operating LPSep 2010 → Jan 2021
  4. 4Extex Operating CompanyFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
367936-99RecompletionSage Energy CompanyDec 22, 1989Jan 25, 1990—3,500
342675-99RecompletionSage Energy CompanyFeb 16, 1988Feb 19, 1988—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 10, 1990Sealy & Smith Foundation -a- 4&5 O-10-17170Halley South (Queen Sand)R2Q Operating LLCPlugged—
Nov 8, 1961Sealy & Smith Foundation -a- 2 O-10-16318Halley (Clear Fork)R2Q Operating LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,738 ft elevation.Download CSV →

FormationMD ftSubsea
Queen3,200-462

Perforations

Perforated and open-hole intervals.

FromToType
3,2103,231Perforated
5,4215,465Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.625513—350 S
5.55,463—1,235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 1990Mar 12, 1990Yes
00Apr 10, 1990——
00Jan 12, 1984Nov 22, 1961—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49505678, documented in the API reference.