TEXAS · WELLS · WINKLER COUNTY · API 42-495-30074 · DISTRICT 7B
Sealy-Smith Foundation -A- #38
Winkler County · Monahans North (Glorieta) field · Shut In · Vertical
Sealy-Smith Foundation -A- #38 (API 42-495-30074) is a well in Winkler County operated by Hilcorp Energy Company, completed April 2, 2018 and listed as shut in on the RRC schedule, shut in October 1, 2016.
The RRC has issued 3 drilling permits between 1978 and 2004, permitted to 10,235 ft.
It was permitted by Apache Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 7 formation tops, including Queen, U Clearfork, U. Clearfork, Clear Fork.
Its 3 leases have reported 1.73M barrels of oil and 17.5M mcf of gas since January 1993, last reporting in July 2026. The leases carry 51 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Apache Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Apache CorporationJan 5, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,235
- total depth, ft
- 3
- permits on file
- Jan 5, 2004
- last permit issued
- Apr 2, 2018
- completed
- 1.73M
- cumulative oil, bbl
- 17.5M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 2, 2018
- Shut in
- Oct 1, 2016
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 51 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sealy-Smith Foundation -A- O-10-4406 | Monahans, North | Hilcorp Energy Company | 9 | 77K | 1.48M | Jan 1993 – Jul 2026 |
| Sealy-Smith Foundation -A- O-10-4410 | Monahans, North (Glorieta) | Hilcorp Energy Company | 12 | 115K | 1.33M | Jan 1993 – Jul 2026 |
| Sealy Smith Foundation -A- O-10-31515 | Monahans, North (Clearfork) | Hilcorp Energy Company | 30 | 1.54M | 14.6M | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 77,736 · prior 12 84,370(-8%)
Oil, barrels lease total
Last 12 months 7,502 · prior 12 6,775(+11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MW Petroleum CorporationJan 1993 → Aug 1998
- 2Apache CorporationSep 1998 → Nov 2024
- 3Hilcorp Energy CompanyDec 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 539943-99 | Recompletion | Apache Corporation | Dec 18, 2003 | Jan 5, 2004 | May 27, 2003 | 7,983 |
| 483564-99 | Recompletion | Apache Corporation | Mar 29, 1999 | Mar 31, 1999 | Mar 12, 1999 | 7,983 |
| 31050-99 | Other | Amoco Production Co.-Andrews | Aug 21, 1978 | Aug 21, 1978 | Oct 9, 1978 | 8,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 2, 2018 | Sealy-Smith Foundation -A- O-10-4410 | Monahans North (Glorieta) | Hilcorp Energy Company | Shut In · shut in Oct 1, 2016 | 10,235 |
| Apr 1, 1999 | Sealy Smith Foundation -A- O-10-31515 | Monahans North (Clearfork) | Hilcorp Energy Company | Not on Schedule | — |
| Oct 16, 1979 | Sealy-Smith Foundation -A- O-10-4406 | Monahans North | Hilcorp Energy Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,760 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen | 3,440 | -680 |
| U Clearfork | 5,460 | -2,700 |
| U. Clearfork | 5,460 | -2,700 |
| Clear ForkUPPER CLEARFORK | 5,460 | -2,700 |
| L Clearfork | 5,770 | -3,010 |
| L. Clearfork | 5,770 | -3,010 |
| Clear ForkLOWER CLEARFORK | 5,770 | -3,010 |
| Tubb | 6,100 | -3,340 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,052 | 5,290 | Perforated |
| 5,562 | 5,570 | Perforated |
| 5,576 | 5,580 | Perforated |
| 5,583 | 5,585 | Perforated |
| 6,056 | 6,234 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 1,107 | 15 | 750 S |
| 8.625 | 3,774 | 11 | 1,400 S |
| 2.375 | 5,954 | — | — |
| 5.5 | 8,619 | 7.875 | 1,150 S |
| 5.5 | 8,620 | 7.875 | 1,150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 2018 | Apr 17, 2018 | — |
| 00 | Jun 24, 2004 | Jan 26, 2004 | Yes |
| 00 | May 14, 2004 | — | — |
| 00 | Aug 16, 1999 | Apr 28, 1999 | Yes |
| 00 | Jul 22, 1999 | Jan 10, 1980 | — |
| 00 | Jan 12, 1984 | Jan 10, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-30074 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-30074 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49530074, documented in the API reference.