TEXAS · WELLS · WINKLER COUNTY · API 42-495-30497 · DISTRICT 7B

Sealy & Smith 7A #1

Y

Winkler County · Arenoso (Strawn Detritus) field · Producing  · Vertical

Sealy & Smith 7a #1 (API 42-495-30497) is a well in Winkler County operated by Blackbeard Operating LLC, completed November 13, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 1, 2004, permitted to 9,010 ft.

It was permitted by Wtg Exploration and has since transferred to Blackbeard Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Pennsylvanian, Strawn.

Its 2 leases have reported 225K barrels of oil and 44.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Blackbeard Operating LLC

Permitted by WTG Exploration; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
2,263
Phone
(432) 242-0050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSage Energy Company
Production reportsBlackbeard Operating, LLCthrough Apr 2026
Latest permitWTG ExplorationSep 1, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,010
total depth, ft
1
permits on file
Sep 1, 2004
last permit issued
Nov 13, 2004
completed
225K
cumulative oil, bbl
44.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 13, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sealy & Smith 7A O-10-37453Arenoso (Strawn Detritus)Blackbeard Operating, LLC136.7K6.93KNov 2004 – Jul 2026
Sealy & Smith "7A" O-10-24535Arenoso (Strawn Detritus)Sage Energy Company1188K37.9KJan 1993 – Apr 2004

Oil, barrels lease total

Last 12 months 2,211 · prior 12 2,038(+8%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sage Energy CompanyJan 1993 → Oct 2003
  2. 2WTG ExplorationNov 2004 → Mar 2025
  3. 3Blackbeard Operating, LLCApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
550392-99ReenterWTG ExplorationSep 1, 2004Sep 1, 2004Sep 7, 20048,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 13, 2004Sealy & Smith 7A O-10-37453Arenoso (Strawn Detritus)Blackbeard Operating LLCProducing9,010
Apr 18, 1977Sealy & Smith 7A O-10-24535Arenoso (Strawn Detritus)Sage Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,845 ft elevation.Download CSV →

FormationMD ftSubsea
PennsylvanianPENN8,300-5,455
Strawn8,784-5,939

Perforations

Perforated and open-hole intervals.

FromToType
8,7968,904Perforated
8,7968,905Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62594012.25450 S
4.59,0077.875600 S
4.59,0107.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 27, 2005Nov 23, 2004Yes
00Feb 14, 2005——
00Jan 12, 1984Apr 28, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49530497, documented in the API reference.