TEXAS · WELLS · WINKLER COUNTY · EL CAPITAN WATER SUPPLY WELL LEASE · API 42-495-31013 · DISTRICT 7B

El Capitan Water Supply Well #28

Shut in

Winkler County · Harper field · Water Supply  · Vertical

El Capitan Water Supply Well #28 (API 42-495-31013) is a well in Winkler County operated by Oxy USA Wtp LP, completed April 18, 1979 and listed as water supply on the RRC schedule, shut in February 1, 2026.

The RRC has issued one drilling permit, issued November 30, 1978, permitted to 5,135 ft.

It was permitted by Shell Oil Company and has since transferred to Oxy USA Wtp LP on the wellbore schedule.

Completion filings report 6 formation tops, including Santa Rosa, Top Of Salt, Tansill, Yates.

No lease production has been reported under this well’s leases.

Operator of record

OXY USA WTP LP

Permitted by Shell Oil Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
2,289
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsnone
Latest permitShell Oil CompanyNov 30, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,135
total depth, ft
1
permits on file
Nov 30, 1978
last permit issued
Apr 18, 1979
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 18, 1979
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
El Capitan Water Supply Well O-10-23530HarperOXY USA WTP LP900Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
37767-99DrillShell Oil CompanyNov 30, 1978Nov 30, 1978Mar 8, 19795,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 18, 1979El Capitan Water Supply Well O-10-23530HarperOXY USA WTP LPWater Supply · shut in Feb 1, 20265,135

Formation tops

As filed on W-2/G-1. Subsea from 2,843 ft elevation.Download CSV →

FormationMD ftSubsea
Santa RosaBASE OF SANTA ROSA1,5001,343
Top of Salt2,500343
Tansill3,100-257
Yates3,200-357
Seven Rivers3,600-757
El Capitan Reef3,900-1,057

Perforations

Perforated and open-hole intervals.

FromToType
3,5715,135Perforated
3,5855,135Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
201,430262,481 S
13.3753,57117.53,400 S
13.3753,58417.53,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 27, 2005Aug 5, 2005—
00Nov 9, 2000Mar 22, 2000—
00Jan 12, 1984Jan 20, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49531013, documented in the API reference.