WELL · 42-495-31187 · DISTRICT 8

Jenkins Ben et al -A- #19

Y

Winkler County · Keystone (Colby) field · Producing  · Vertical

Jenkins Ben ET AL -A- #19 (API 42-495-31187) is a well in Winkler County operated by Hilcorp Energy Company, completed September 21, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 8, 1980, permitted to 3,530 ft.

It was permitted by Bass Enterprises Production CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Queen, Colby, Grayburg.

Its lease has reported 133K barrels of oil and 125K mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Bass Enterprises Production Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitBass Enterprises Production Co.Apr 8, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,530
total depth, ft
1
permits on file
Apr 8, 1980
last permit issued
Sep 21, 2018
completed
133K
cumulative oil, bbl
125K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 21, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jenkins Ben et al -A- O-10-25588Keystone (Colby)Hilcorp Energy Company9133K125KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3,660 · prior 12 2,006(+82%)

05001K202420252026

Gas, mcf lease total

Last 12 months 395 · prior 12 1,799(-78%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bass Enterprises Production Co.Jan 1993 → Dec 2006
  2. 2Bepco, L.P.Jan 2007 → Nov 2008
  3. 3Bopco, L.P.Dec 2008 → Nov 2017
  4. 4XTO Energy Inc.Dec 2017 → Jan 2025
  5. 5Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
80462-99DrillBass Enterprises Production Co.Apr 8, 1980Apr 8, 1980—3,530

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-25588————

Formation tops

As filed on W-2/G-1. Subsea from 2,966 ft elevation.Download CSV →

FormationMD ftSubsea
Queen3,213-247
Colby3,337-371
Grayburg3,524-558

Perforations

Perforated and open-hole intervals.

FromToType
3,3433,513Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62558412.25380 S
2.3753,480——
5.53,5567.875350 S
5.53,5607.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 2018Nov 16, 2018—
00Jan 12, 1984Jun 5, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49531187, documented in the API reference.