TEXAS · WELLS · WINKLER COUNTY · API 42-495-31356 · DISTRICT 7B
Bash #14
Winkler County · Keystone (Colby) field · Temp Abandoned · Vertical
Bash #14 (API 42-495-31356) is a well in Winkler County operated by Hilcorp Energy Company, completed August 11, 1981 and listed as temp abandoned on the RRC schedule, shut in September 1, 2022.
The RRC has issued one drilling permit, issued June 9, 1981, permitted to 3,570 ft.
It was permitted by Phillips Petroleum Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 4 formation tops, including Seven Rivers, Queen, Grayburg, San Andres.
Its 2 leases have reported 10.7K barrels of oil and 231K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 11 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Aug 2022 |
| Latest permit | Phillips Petroleum CompanyJun 9, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,570
- total depth, ft
- 1
- permits on file
- Jun 9, 1981
- last permit issued
- Aug 11, 1981
- completed
- 10.7K
- cumulative oil, bbl
- 231K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2022
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 11, 1981
- Shut in
- Sep 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bash G-10-288146 | Keystone (Colby) | Hilcorp Energy Company | 1 | 0 | 13.4K | Sep 2019 – Aug 2022 |
| Bash O-10-16091 | Keystone (Colby) | Hilcorp Energy Company | 10 | 10.7K | 218K | Jan 1993 – Jul 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arch Petroleum Inc.Jan 1993 → Dec 1998
- 2Bass Enterprises Production Co.Jan 1999 → Dec 2006
- 3Bepco, L.P.Jan 2007 → Sep 2008
- 4Bopco, L.P.Jan 2009 → Nov 2017
- 5XTO Energy Inc.Dec 2017 → Aug 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 124492-99 | Drill | Phillips Petroleum Company | Jun 9, 1981 | Jun 9, 1981 | Jul 10, 1981 | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 11, 1981 | Bash G-10-288146 | Keystone (Colby) | Hilcorp Energy Company | Temp Abandoned · shut in Sep 1, 2022 | 3,570 |
| Aug 11, 1981 | Bash O-10-16091 | Keystone (Colby) | Hilcorp Energy Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,953 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Seven Rivers | 2,566 | 387 |
| Queen | 3,012 | -59 |
| Grayburg | 3,281 | -328 |
| San Andres | 3,532 | -579 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,013 | 3,517 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,073 | 12.25 | 700 S |
| 2.375 | 3,500 | — | — |
| 4.5 | 3,570 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 27, 2020 | Oct 18, 2019 | Yes |
| 00 | Jan 12, 1984 | Dec 23, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-31356 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-31356 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49531356, documented in the API reference.