WELL · 42-495-31885 · DISTRICT 8
Sealy & Smith 69-C #1
Winkler County · Vertical
Sealy & Smith 69-C #1 (API 42-495-31885) is a permitted well in Winkler County filed by Sheridan Production Company, LLC; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1985 and 2009, permitted to 9,150 ft.
Its 2 leases have reported 228K barrels of oil and 702K mcf of gas since January 1993, last reporting in October 2023. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Sheridan Production Company, LLC
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 23, 2020
- Permits on file
- 1,009
- Phone
- (713) 548-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Legacy Reserves Operating LPthrough Oct 2021 |
| Latest permit | Sheridan Production Company, LLCApr 15, 2009 |
- 9,150
- total depth, ft
- 3
- permits on file
- Apr 15, 2009
- last permit issued
- —
- completed
- 228K
- cumulative oil, bbl
- 702K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sealy & Smith 69-C O-10-36006 | Darmer (Canyon) | Legacy Reserves Operating LP | 1 | 217K | 664K | Mar 1999 – Oct 2023 |
| Sealy & Smith "69-C" O-10-29800 | Darmer, NE. (Penn) | Legacy Reserves Operating LP | 1 | 10.4K | 37.2K | Jan 1993 – Jan 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sage Energy CompanyJan 1993 → Jul 2007
- 2Sheridan Production Company, LLCAug 2007 → Aug 2010
- 3Legacy Reserves Operating LPSep 2010 → Apr 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 680233-99 | Recompletion | Sheridan Production Company, LLC | Apr 7, 2009 | Apr 15, 2009 | — | 9,000 |
| 484225-99 | Recompletion | Sage Energy Company | Apr 30, 1999 | May 5, 1999 | Mar 4, 1999 | 8,650 |
| 265590-99 | Drill | Sage Energy Company | Jan 28, 1985 | Jan 30, 1985 | Feb 5, 1985 | 9,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-29800 | — | — | — | — |
| — | — O-10-36006 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,532 | 8,607 | Perforated |
| 8,782 | 8,828 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 570 | 17.5 | 600 S |
| 8.625 | 2,405 | 12.5 | 1,200 S |
| 5.5 | 8,956 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 8, 1999 | Apr 8, 1999 | Yes |
| 00 | Jun 2, 1999 | — | — |
| 00 | May 20, 1985 | Apr 10, 1985 | — |
| 00 | May 15, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-31885 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-31885 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49531885, documented in the API reference.