TEXAS · WELLS · WINKLER COUNTY · UNIVERSITY "E" LEASE · API 42-495-32399 · DISTRICT 7B
University E #3
Winkler County · University Blk. 21(BRUSHY Canyon field · Shut In · Vertical
University E #3 (API 42-495-32399) is a well in Winkler County operated by Wpx Energy Permian LLC, completed April 23, 1992 and listed as shut in on the RRC schedule, shut in September 1, 2021.
The RRC has issued one drilling permit, issued March 19, 1992, permitted to 8,640 ft.
It was permitted by Maralo, Inc. and has since transferred to Wpx Energy Permian LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Reef, Cherry Canyon, Base Manzanita(Map), Base Menzanita(Map).
Its lease has reported 53.6K barrels of oil and 86.3K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Maralo, Inc.; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Oct 22, 2025
- Permits on file
- 956
- Phone
- (405) 235-3611
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | WPX Energy Permian LLC |
| Production reports | WPX Energy Permian, LLCthrough Feb 2021 |
| Latest permit | Maralo, Inc.Mar 19, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,640
- total depth, ft
- 1
- permits on file
- Mar 19, 1992
- last permit issued
- Apr 23, 1992
- completed
- 53.6K
- cumulative oil, bbl
- 86.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 23, 1992
- Shut in
- Sep 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| University "E" O-10-33483 | University Blk. 21(BRUSHY Canyon | WPX Energy Permian, LLC | 1 | 53.6K | 86.3K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maralo, Inc.Jan 1993 → Dec 1998
- 2Maralo, LLCJan 1999 → Apr 2000
- 3Scythian, Ltd.May 2000 → Dec 2003
- 4Chaparral Energy, L.L.C.Jan 2004 → Feb 2014
- 5RKI Exploration & Production LLCMar 2014 → Apr 2018
- 6WPX Energy Permian, LLCMay 2018 → Feb 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 397322-99 | Drill | Maralo, Inc. | Mar 18, 1992 | Mar 19, 1992 | Mar 26, 1992 | 8,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 23, 1992 | University E O-10-33483 | University Blk. 21(BRUSHY Canyon | WPX Energy Permian LLC | Shut In · shut in Sep 1, 2021 | 8,640 |
Formation tops
As filed on W-2/G-1. Subsea from 2,754 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Reef | 3,195 | -441 |
| Cherry Canyon | 5,826 | -3,072 |
| Base Manzanita(map) | 6,174 | -3,420 |
| Base Menzanita(map) | 6,174 | -3,420 |
| Brushy Canyon | 7,094 | -4,340 |
| Bone SpringBONE SPRING LIME | 8,486 | -5,732 |
| Bone SpringBONE SPRINGS LIME | 8,486 | -5,732 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,584 | 7,831 | Perforated |
| 7,976 | 8,022 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 210 | 17.5 | 250 S |
| 8.625 | 3,088 | 11 | 1,050 S |
| 5.5 | 8,640 | 7.875 | 2,025 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 23, 1993 | Jan 25, 1993 | Yes |
| 00 | Jun 22, 1992 | May 27, 1992 | Yes |
| 00 | Jun 4, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-32399 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-32399 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49532399, documented in the API reference.