TEXAS · WELLS · WINKLER COUNTY · API 42-495-32521 · DISTRICT 7B

University 20-11 #1

Plugged

Winkler County · Block 20 (Delaware Cons.) field  · Vertical

University 20-11 #1 (API 42-495-32521) is a plugged well in Winkler County, plugged December 30, 2013, last operated by Oxy USA Inc..

The RRC has issued 3 drilling permits between 1996 and 2011, permitted to 13,000 ft.

Completion filings report 5 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Brushy Canyon.

Its 2 leases have reported 30.7K barrels of oil and 24.7K mcf of gas since April 1996, last reporting in March 2015. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA Inc.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 26, 2026
Permits on file
3,316
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsOXY USA Inc.through Nov 2012
Latest permitOXY USA Inc.Oct 21, 2011
13,000
total depth, ft
3
permits on file
Oct 21, 2011
last permit issued
Apr 1, 1997
completed
30.7K
cumulative oil, bbl
24.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Mar 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 1997
Shut in
—
Plugged
Dec 30, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University 20-11 O-10-35497Block 20 (Delaware Cons.)OXY USA Inc.119.6K15.4KApr 1997 – Mar 2015
University 20-11 O-10-34907Block 20 (Wolfcamp)OXY USA Inc.111K9.24KApr 1996 – Jan 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pogo Producing CompanyApr 1996 → Jan 2008
  2. 2Pogo Producing Company LLCFeb 2008 → Feb 2008
  3. 3OXY USA Inc.Mar 2008 → Nov 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
726564-99RecompletionOXY USA Inc.Oct 19, 2011Oct 21, 2011—13,000
461089-99RecompletionPogo Producing Co.Apr 14, 1997Apr 16, 1997Mar 26, 199711,930
444533-99DrillPogo Producing Co.Feb 6, 1996Feb 5, 1996Feb 14, 199612,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 1997University 20-11 O-10-35497Block 20 (Delaware Cons.)OXY USA Inc.Plugged—
Apr 7, 1996University 20-11 O-10-34907Block 20 (Wolfcamp)OXY USA Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,789 ft elevation.Download CSV →

FormationMD ftSubsea
DelawareDELAWARE LIME5,088-2,299
Bell Canyon5,114-2,325
Cherry Canyon6,083-3,294
Brushy Canyon7,368-4,579
Bone Spring8,916-6,127

Perforations

Perforated and open-hole intervals.

FromToType
8,5728,598Perforated
11,66011,692Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37548017.5560 S
8.6254,902111,200 S
5.511,9307.8752,470 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 1998Apr 16, 1997Yes
00Feb 27, 1998Apr 16, 1997—
00Oct 29, 1997——
00May 24, 1996Apr 30, 1996Yes
00May 14, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Aug 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000107673W-14 DisposalPlugged Sep 23, 20145,0002,0007,860–8,360

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49532521, documented in the API reference.