WELL · 42-495-32539 · DISTRICT 8
Taylor Hanks Unit #1
Winkler County · Keystone (San Andres) field · Vertical
Taylor Hanks Unit #1 (API 42-495-32539) is a well in Winkler County operated by Gruy Petroleum Management CO., completed March 16, 2001.
The RRC has issued 2 drilling permits between 1996 and 2000, permitted to 5,600 ft.
It was permitted by Prize Operating Company and has since transferred to Gruy Petroleum Management CO. on the wellbore schedule.
Completion filings report 4 formation tops, including Queen, Colby, San Andres, Holt.
Its 5 leases have reported 1.63M barrels of oil and 2.11M mcf of gas since April 1996, last reporting in July 2026. The leases carry 163 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Permitted by Prize Operating Company; the EWA schedule now lists a different operator.
- Based in
- Irving, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 22, 2005
- Permits on file
- 678
- Phone
- (303) 295-3995
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gruy Petroleum Management Co. |
| Production reports | Formentera Operations LLCthrough Apr 2026 |
| Latest permit | Prize Operating CompanyDec 20, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,600
- total depth, ft
- 2
- permits on file
- Dec 20, 2000
- last permit issued
- Mar 16, 2001
- completed
- 1.63M
- cumulative oil, bbl
- 2.11M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 16, 2001
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 163 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| East Keystone (San a Holt Unit) O-10-46985 | Keystone (Consolidated) | Formentera Operations LLC | 76 | 264K | 109K | Sep 2015 – Jul 2026 |
| East Keystone(san a Holt Unit) O-10-36780 | Keystone (Holt) | Merit Energy Company | 81 | 1.29M | 1.81M | Jan 2002 – Dec 2015 |
| Taylor, Mack O-10-34895 | Keystone (Holt) | Gruy Petroleum Management Co. | 4 | 46.3K | 148K | Apr 1996 – Apr 2002 |
| Taylor Hanks Unit O-10-36728 | Keystone (San Andres) | Gruy Petroleum Management Co. | 1 | 3.06K | 2.66K | Mar 2001 – Apr 2002 |
| Taylor-Hanks Unit O-10-35081 | Keystone (Holt) | Prize Operating Company | 1 | 25.6K | 43.7K | Jun 1996 – Oct 2001 |
Oil, barrels lease total
Last 12 months 6,968 · prior 12 7,996(-13%)
Gas, mcf lease total
Last 12 months 2,310 · prior 12 1,854(+25%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hallwood Petroleum, Inc.Jun 1996 → Jan 2000
- 2Prize Operating CompanyFeb 2000 → Mar 2002
- 3Gruy Petroleum Management Co.Apr 2002 → Apr 2006
- 4Cimarex Energy Co. of ColoradoMay 2006 → Dec 2012
- 5Merit Energy CompanyJan 2013 → Nov 2016
- 6Blackbeard Operating, LLCDec 2016 → May 2021
- 7Saddleback Exploration, LLCJun 2021 → Apr 2024
- 8Formentera Operations LLCMay 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 503251-99 | Recompletion | Prize Operating Company | Dec 19, 2000 | Dec 20, 2000 | Dec 20, 2000 | 5,600 |
| 447715-99 | Drill | Hallwood Petroleum, Inc. | May 2, 1996 | May 6, 1996 | May 18, 1996 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-34895 | — | — | — | — |
| — | — O-10-35081 | — | — | — | — |
| — | — O-10-36728 | — | — | — | — |
| — | — O-10-36780 | — | — | — | — |
| — | — O-10-46985 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,979 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen | 3,255 | -276 |
| Colby | 3,516 | -537 |
| San Andres | 4,149 | -1,170 |
| San Andres | 4,510 | -1,531 |
| Holt | 5,278 | -2,299 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,510 | 4,692 | Perforated |
| 5,278 | 5,357 | Perforated |
| 5,278 | 5,358 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 212 | 17.5 | 300 S |
| 13.063 | 212 | 17.5 | 300 S |
| 8.625 | 1,124 | 12.25 | 600 S |
| 5.5 | 5,600 | 7.875 | 1,265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 4, 2015 | Jun 19, 2002 | — |
| 00 | Aug 15, 2002 | Jun 19, 2002 | — |
| 00 | Jan 24, 2002 | Mar 26, 2001 | Yes |
| 00 | Nov 1, 2001 | Mar 26, 2001 | Yes |
| 00 | Oct 18, 2001 | — | — |
| 00 | May 16, 1997 | Feb 4, 1997 | — |
| 00 | Nov 1, 1996 | Jun 17, 1996 | Yes |
| 00 | Aug 7, 1996 | Jun 17, 1996 | Yes |
| 00 | Jul 19, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-32539 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-32539 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 315K
- bbl, all reported
- Aug 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092017 | H-1 Injection | Active | 1,500 | 1,000 | 4,310–5,600 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49532539, documented in the API reference.