WELL · 42-495-32716 · DISTRICT 8

7306 JV-S Wink #10

Plugged

Winkler County · War-Wink (Cherry Canyon) field  · Vertical

7306 JV-S Wink #10 (API 42-495-32716) is a plugged well in Winkler County, plugged March 9, 2017, last operated by Halcon Operating CO. Inc..

The RRC has issued one drilling permit, issued December 18, 1997, permitted to 7,500 ft.

It was permitted by Bta Oil Producers and has since transferred to Halcon Operating CO. Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Bell Canyon, Cherry Canyon, Manzanita, Brushy Canyon.

Its lease has reported 620K barrels of oil and 1.05M mcf of gas since March 1996, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Halcon Operating Co. Inc.

Permitted by BTA Oil Producers; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 6, 2026
Permits on file
573
Phone
(832) 350-1221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHalcon Operating Co. Inc.
Production reportsHalcon Operating Co., Inc.through Dec 2025
Latest permitBTA Oil ProducersDec 18, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
Dec 18, 1997
last permit issued
Feb 15, 1998
completed
620K
cumulative oil, bbl
1.05M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 1998
Shut in
—
Plugged
Mar 9, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
7306 JV-S Wink O-10-34869War-Wink (Cherry Canyon)Halcon Operating Co., Inc.10620K1.05MMar 1996 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 109(-100%)

0204060202420252026

Gas, mcf lease total

Last 12 months 245 · prior 12 365(-33%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BTA Oil ProducersMar 1996 → Jan 2008
  2. 2BTA Oil Producers, LLCFeb 2008 → Mar 2018
  3. 3Halcon Operating Co., Inc.Apr 2018 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471093-99DrillBTA Oil ProducersDec 11, 1997Dec 18, 1997Jan 13, 19987,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-34869————

Formation tops

As filed on W-2/G-1. Subsea from 2,715 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,013-2,298
Cherry Canyon5,854-3,139
Manzanita6,120-3,405
Cherry CanyonCHERRY CANYON PAY6,784-4,069
Brushy Canyon7,075-4,360

Perforations

Perforated and open-hole intervals.

FromToType
6,5227,173Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,62812.251,300 S
5.57,3057.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 24, 1998Feb 20, 1998Yes
00Mar 16, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49532716, documented in the API reference.