WELL · 42-495-32746 · DISTRICT 8
Maxwell 18 #1
Winkler County · Emperor (Simpson) field · Producing · Vertical
Maxwell 18 #1 (API 42-495-32746) is a well in Winkler County operated by Permex Petroleum Corporation, completed June 1, 1999 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 4, 1999, permitted to 12,500 ft.
It was permitted by Pogo Producing CO. and has since transferred to Permex Petroleum Corporation on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Pogo Producing Co.; the EWA schedule now lists a different operator.
- Based in
- Graham, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 22, 2025
- Permits on file
- 4
- Phone
- (940) 549-0131
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Permex Petroleum Corporation |
| Production reports | Permex Petroleum Corporationthrough Nov 2025 |
| Latest permit | Pogo Producing Co.Feb 4, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 1
- permits on file
- Feb 4, 1999
- last permit issued
- Jun 1, 1999
- completed
- 0
- cumulative oil, bbl
- 1.47M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 1, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Maxwell "18" G-10-174840 | Que Suerta (Waddell) | Permex Petroleum Corporation | 1 | 0 | 1.47M | Jun 1999 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,105 · prior 12 3,923(+5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pogo Producing CompanyJun 1999 → Apr 2001
- 2Texaco E & P Inc.May 2001 → May 2002
- 3Chevron U. S. A. Inc.Jun 2002 → Feb 2022
- 4Ruckus Energy Operating, LLCMar 2022 → Oct 2024
- 5Permex Petroleum CorporationJan 2025 → Nov 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482443-99 | Drill | Pogo Producing Co. | Feb 4, 1999 | Feb 4, 1999 | Apr 4, 1999 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-174840 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,452 | 11,457 | Perforated |
| 11,452 | 11,467 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 452 | 17.5 | 465 S |
| 13.375 | 542 | 17.5 | 465 S |
| 9.625 | 4,000 | 12.25 | 1,950 S |
| 5.5 | 11,748 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2001 | Feb 12, 2001 | — |
| 00 | Dec 22, 1999 | Jul 8, 1999 | Yes |
| 00 | Nov 30, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-32746 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-32746 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49532746, documented in the API reference.