WELL · 42-497-00246 · DISTRICT 9
Tarrant Co. Waterboard Unit 2 #2
Wise County · Cap Yates (Consolidated Congl.) field · Vertical
Tarrant CO. Waterboard Unit 2 #2 (API 42-497-00246) is a well in Wise County operated by Enserch Exploration Inc, completed June 10, 1982.
The RRC has issued one drilling permit, issued February 10, 1982, permitted to 7,325 ft.
Completion filings report 2 formation tops, including Caddo, Congl..
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 31, 1997
- Permits on file
- 984
- Phone
- (214) 692-4570
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enserch Exploration Inc |
| Production reports | Eagleridge Operating, LLCthrough Jan 2021 |
| Latest permit | Enserch Exploration, IncFeb 10, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,325
- total depth, ft
- 1
- permits on file
- Feb 10, 1982
- last permit issued
- Jun 10, 1982
- completed
- 0
- cumulative oil, bbl
- 139K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 10, 1982
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tarrant County Waterboard Unit 2 G-13-126842 | Cap Yates (Consolidated Congl.) | Eagleridge Operating, LLC | 1 | 0 | 139K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EP Operating Limited PartnershipJan 1993 → Feb 1995
- 2Enserch Exploration, IncMar 1995 → Dec 1997
- 3Merit Energy CompanyJan 1998 → Sep 2019
- 4Eagleridge Operating, LLCNov 2019 → Jan 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 150509-99 | Other | Enserch Exploration, Inc | Feb 10, 1982 | Feb 10, 1982 | Feb 11, 1982 | 7,325 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-126842 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 843 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 5,642 | -4,799 |
| Congl. | 5,826 | -4,983 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,360 | 6,368 | Perforated |
| 6,388 | 6,398 | Perforated |
| 6,940 | 6,950 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 341 | 12.25 | 230 S |
| 4.5 | 7,056 | 8.75 | 570 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 26, 1988 | Feb 25, 1988 | — |
| 00 | Apr 13, 1988 | — | — |
| 00 | Jan 12, 1984 | Aug 22, 1983 | — |
| 00 | Jan 12, 1984 | Jun 24, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-00246 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-00246 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49700246, documented in the API reference.