TEXAS · WELLS · WISE COUNTY · EVERETT, D. P. LEASE · API 42-497-01968 · DISTRICT 7C
Everett D. P. #1C
Wise County · Alvord (Caddo Conglomerate) field · Vertical
Everett D. P. #1C (API 42-497-01968) is a plugged well in Wise County, plugged January 21, 1997, last operated by Mitchell Energy Corporation.
The RRC has issued one drilling permit, issued December 15, 1993, permitted to 5,870 ft.
Completion filings report 3 formation tops, including Strawn, Caddo, Atoka.
Its lease has reported 2 barrels of oil and 588 mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 18, 2000
- Permits on file
- 4,224
- Phone
- (713) 377-5818
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mitchell Energy Corporation |
| Production reports | Mitchell Energy Corporationthrough Dec 1993 |
| Latest permit | Mitchell Energy CorporationDec 15, 1993 |
- 5,870
- total depth, ft
- 1
- permits on file
- Dec 15, 1993
- last permit issued
- Aug 21, 1956
- completed
- 2
- cumulative oil, bbl
- 588
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 21, 1956
- Shut in
- —
- Plugged
- Jan 21, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Everett, D. P. G-13-21159 | Alvord (Caddo Conglomerate) | Mitchell Energy Corporation | 1 | 2 | 588 | Jan 1993 – Dec 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationJan 1993 → Dec 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 419279-99 | Recompletion | Mitchell Energy Corporation | Dec 13, 1993 | Dec 15, 1993 | Mar 3, 1994 | 5,870 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 21, 1956 | Everett D. P. G-13-21159 | Alvord (Caddo Conglomerate) | Mitchell Energy Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 874 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,395 | 5,399 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 324 | 13.75 | 200 S |
| 10.75 | 366 | 13.75 | 200 S |
| 5.5 | 5,815 | 8.75 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 11, 1997 | Dec 20, 1996 | — |
| 00 | Jun 6, 1994 | Apr 29, 1994 | — |
| 00 | Apr 21, 1994 | Feb 23, 1994 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-01968 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-01968 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49701968, documented in the API reference.