TEXAS · WELLS · WISE COUNTY · API 42-497-31673 · DISTRICT 7C

Gregg Charlie A. #1

Plugged

Wise County · Alvord (Caddo Conglomerate) field  · Vertical

Gregg Charlie A. #1 (API 42-497-31673) is a plugged well in Wise County, plugged May 29, 2013, last operated by Richey Ray Management CO. Inc..

The RRC has issued one drilling permit, issued November 16, 1979, permitted to 6,500 ft.

It was permitted by Mote Resources, Inc. and has since transferred to Richey Ray Management CO. Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Atoka.

Its 2 leases have reported 1.66K barrels of oil and 34.3K mcf of gas since January 1993, last reporting in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Richey Ray Management Co. Inc.

Permitted by Mote Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Jan 15, 2026
Permits on file
136
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRichey Ray Management Co. Inc.
Production reportsRichey, Ray Management Co., Inc.through Sep 2010
Latest permitMote Resources, Inc.Nov 16, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Nov 16, 1979
last permit issued
Dec 6, 1979
completed
1.66K
cumulative oil, bbl
34.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 6, 1979
Shut in
—
Plugged
May 29, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gregg, Charlie A. G-13-165799Alvord (Caddo Conglomerate)Richey, Ray Management Co., Inc.1014.1KNov 1997 – Apr 2026
Gregg, "a" #1 O-13-19719Alvord (Caddo Conglomerate)Richey, Ray Management Co., Inc.11.66K20.2KJan 1993 – Apr 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Edmonds Management CompanyJan 1993 → Jun 1996
  2. 2Richey, Ray Management Co., Inc.Nov 1997 → Sep 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
64020-99DrillMote Resources, Inc.Nov 16, 1979Nov 16, 1979—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 6, 1979Gregg a #1 O-13-19719Alvord (Caddo Conglomerate)Richey Ray Management Co. Inc.Plugged—
Dec 6, 1979Gregg Charlie A. G-13-165799Alvord (Caddo Conglomerate)Richey Ray Management Co. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,020 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo5,842-4,822
CaddoCADDO CONGL6,058-5,038
Atoka6,130-5,110

Perforations

Perforated and open-hole intervals.

FromToType
6,0586,074Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551512.25350 S
1.256,000——
3.56,1967.875460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 22, 1998Nov 20, 1997—
00Jan 9, 1998——
00Jan 12, 1984Dec 14, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49731673, documented in the API reference.