WELL · 42-497-32207 · DISTRICT 9
Renshaw-Bobo #1
Wise County · Vertical
Renshaw-Bobo #1 (API 42-497-32207) is a plugged well in Wise County, plugged August 25, 1981, last operated by Western Chief Oil & Gas Company.
The RRC has issued 2 drilling permits between 1981 and 2002, permitted to 7,800 ft.
Operator of record
Western Chief Oil & Gas Company
- Based in
- Graham, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 6, 2007
- Permits on file
- 339
- Phone
- (940) 549-0417
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Western Chief Operating, L.L.C.through Jun 2024 |
| Latest permit | Western Chief Oil & Gas CompanyFeb 27, 2002 |
- 7,800
- total depth, ft
- 2
- permits on file
- Feb 27, 2002
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 2.44M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 25, 1981
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Renshaw-Bobo Unit G-13-192608 | Newark, East (Barnett Shale) | Winfield Operating Company | 1 | 0 | 2.44M | May 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 2,976(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Western Chief Oil & Gas CompanyDec 2002 → Feb 2008
- 2Western Chief Operating, L.L.C.Mar 2008 → Jun 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 516851-99 | Reenter | Western Chief Oil & Gas Company | Jan 16, 2002 | Feb 27, 2002 | Apr 25, 2002 | 7,800 |
| 126145-99 | Drill | Seely Oil Co. | Jul 21, 1981 | Jul 21, 1981 | — | 6,740 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-192608 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,007 | 7,383 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,038 | 12.25 | — |
| 5.5 | 7,380 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 2003 | Jan 31, 2003 | — |
| 00 | Mar 6, 2003 | Nov 1, 2002 | Yes |
| 00 | Feb 5, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-32207 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-32207 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49732207, documented in the API reference.