WELL · 42-497-32636 · DISTRICT 9
Fletcher Unit #7
Wise County · Fletcher (Conglomerate) field · Vertical
Fletcher Unit #7 (API 42-497-32636) is a well in Wise County operated by Ryder Scott Oil Company, completed October 10, 1983.
The RRC has issued one drilling permit, issued August 17, 1983, permitted to 7,300 ft.
Its 2 leases have reported 3.63K barrels of oil and 188K mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 21, 2013
- Permits on file
- 292
- Phone
- (940) 723-5313
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ryder Scott Oil Company |
| Production reports | Eagleridge Operating, LLCthrough Apr 2026 |
| Latest permit | Ryder Scott Oil Co.Aug 17, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,300
- total depth, ft
- 1
- permits on file
- Aug 17, 1983
- last permit issued
- Oct 10, 1983
- completed
- 3.63K
- cumulative oil, bbl
- 188K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 10, 1983
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fletcher G-13-150413 | Fletcher (Conglomerate) | Eagleridge Operating, LLC | 1 | 0 | 143K | Apr 1994 – Jul 2026 |
| Fletcher Unit O-13-23250 | Fletcher (Conglomerate) | Ryder Scott Oil Company | 9 | 3.63K | 45.1K | Jan 1993 – Nov 1994 |
Gas, mcf lease total
Last 12 months 554 · prior 12 158(+251%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ryder Scott Oil CompanyJan 1993 → Dec 2005
- 2Ryder Scott Management, LLCJan 2006 → Mar 2018
- 31849 Energy Partners, LLCApr 2018 → Oct 2018
- 41849 Energy Partners Oprtng, LLCNov 2018 → Feb 2022
- 5Eagleridge Operating, LLCFeb 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 206264-99 | Drill | Ryder Scott Oil Co. | Aug 4, 1983 | Aug 17, 1983 | — | 7,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-150413 | — | — | — | — |
| — | — O-13-23250 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,010 | 7,074 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 975 | 12.25 | 490 S |
| 2.375 | 6,950 | — | — |
| 4.5 | 7,193 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 11, 1994 | — | — |
| 00 | Jan 12, 1984 | Oct 14, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-32636 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-32636 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49732636, documented in the API reference.