TEXAS · WELLS · WISE COUNTY · KELLEY-CLARK UNIT LEASE · API 42-497-32825 · DISTRICT 7C
Kelley-Clark Unit #2
Wise County · Boonsville (Bend Congl. Gas) field · Vertical
Kelley-Clark Unit #2 (API 42-497-32825) is a plugged well in Wise County, plugged June 28, 2000, last operated by Mitchell Energy Corporation.
The RRC has issued 3 drilling permits between 1983 and 1984, permitted to 7,100 ft.
Completion filings report 3 formation tops, including Caddo, Atika E, Atoka.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 18, 2000
- Permits on file
- 4,224
- Phone
- (713) 377-5818
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mitchell Energy Corporation |
| Production reports | Mitchell Energy Corporationthrough Nov 1997 |
| Latest permit | Mitchell Energy CorporationSep 24, 1984 |
- 7,100
- total depth, ft
- 3
- permits on file
- Sep 24, 1984
- last permit issued
- Dec 10, 1984
- completed
- 0
- cumulative oil, bbl
- 40.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 10, 1984
- Shut in
- —
- Plugged
- Jun 28, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kelley-Clark Unit G-13-114977 | Boonsville (Bend Congl., Gas) | Mitchell Energy Corporation | 1 | 0 | 40.4K | Jan 1993 – Jun 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationJan 1993 → Nov 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 252460-99 | Drill | Mitchell Energy Corporation | Sep 26, 1984 | Sep 24, 1984 | — | 7,000 |
| 247876-99 | Drill | Mitchell Energy Corporation | Sep 21, 1984 | Aug 9, 1984 | — | 7,000 |
| 201412-99 | Drill | Mitchell Energy Corporation | Jul 13, 1983 | Jul 13, 1983 | — | 7,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 10, 1984 | Kelley-Clark Unit G-13-114977 | Boonsville (Bend Congl. Gas) | Mitchell Energy Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 761 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,898 | 4,072 | Perforated |
| 5,421 | 5,491 | Perforated |
| 5,658 | 5,743 | Perforated |
| 5,840 | 5,846 | Perforated |
| 5,936 | 5,940 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 337 | 14.75 | 320 S |
| 5.5 | 6,102 | 8.75 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 28, 1999 | Dec 17, 1998 | — |
| 00 | May 23, 1991 | Mar 2, 1991 | — |
| 00 | Mar 5, 1985 | Jan 4, 1985 | — |
| 00 | Feb 28, 1985 | Dec 12, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-32825 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-32825 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49732825, documented in the API reference.