TEXAS · WELLS · WISE COUNTY · API 42-497-33019 · DISTRICT 7C

Deaver H.J. #2017

Plugged

Wise County · Alvord (Atoka Conglomerate) field  · Vertical

Deaver H.J. #2017 (API 42-497-33019) is a plugged well in Wise County, plugged August 11, 2023, last operated by Schalk Oil Company Inc..

The RRC has issued one drilling permit, issued May 21, 1985, permitted to 6,000 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Schalk Oil Company Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Atoka.

Operator of record

Schalk Oil Company Inc.

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Jun 3, 2026
Permits on file
184
Phone
(940) 322-3424

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSchalk Oil Company Inc.
Production reportsnone
Latest permitMitchell Energy CorporationMay 21, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
May 21, 1985
last permit issued
Jul 30, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 30, 1985
Shut in
—
Plugged
Aug 11, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Deaver, H.J. O-13-28373Alvord (Atoka Conglomerate)Schalk Oil Company, Inc.1000Jan 1993 – Jul 2026
— O-13-25000——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
275574-99DrillMitchell Energy CorporationJun 11, 1985May 21, 1985—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 30, 1985Deaver H.J. O-13-28373Alvord (Atoka Conglomerate)Schalk Oil Company Inc.Plugged—
Jul 30, 1985Speer-Deaver (Atoka) Unit O-13-25000Alvord (Atoka Conglomerate)Mitchell Energy CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 797 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LIME5,246-4,449
CaddoCADDO LIME5,264-4,467
AtokaATOKA CONGL.5,590-4,793
AtokaATOKA CONGLOMERATE5,590-4,793

Perforations

Perforated and open-hole intervals.

FromToType
5,5915,732Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62536114.75300 S
5.55,8658.75300 S
5.55,8698.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 7, 1999Sep 24, 1999—
00Sep 11, 1992Aug 25, 1992—
00Aug 19, 1992Aug 2, 1991—
00Sep 10, 1991Aug 2, 1991—
00Aug 30, 1991Aug 12, 1991—
00Jun 7, 1991May 17, 1991—
00Aug 14, 1986Jul 31, 1986—
00Aug 6, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
527K
bbl, all reported
Oct 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058337H-1 InjectionPlugged Sep 22, 20235001,6005,591–5,732

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 57,290(-100%)

05K10K19901991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49733019, documented in the API reference.