TEXAS · WELLS · WISE COUNTY · API 42-497-33707 · DISTRICT 7C

Chandler-Davis Unit #3

Y

Wise County · Boonsville (Bend Congl. Gas) field · Producing  · Vertical

Chandler-Davis Unit #3 (API 42-497-33707) is a well in Wise County operated by Bkv Barnett LLC, completed July 12, 1994 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1992 and 1994, permitted to 6,100 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Bkv Barnett LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Kenkirk, Caddo, Atoka.

No lease production has been reported under this well’s leases.

Operator of record

BKV Barnett LLC

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
143
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV Barnett LLC
Production reportsBKV Barnett, LLCthrough Apr 2026
Latest permitMitchell Energy CorporationJul 27, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
2
permits on file
Jul 27, 1994
last permit issued
Jul 12, 1994
completed
0
cumulative oil, bbl
538K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chandler-Davis Unit G-13-150854Boonsville (Bend Congl., Gas)BKV Barnett, LLC10538KJul 1994 – Jul 2026
Chandler-Davis Unit G-13-146740WildcatMitchell Energy Corporation100Jan 1993 – Jul 1994

Gas, mcf lease total

Last 12 months 4,859 · prior 12 5,871(-17%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationJul 1994 → Dec 2000
  2. 2Mitchell Energy Company L.P.Jan 2001 → Mar 2002
  3. 3Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
  4. 4Devon Energy Production Co, L.P.Aug 2004 → Sep 2020
  5. 5BKV Barnett, LLCOct 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
426211-99OtherMitchell Energy CorporationJul 25, 1994Jul 27, 1994Jun 28, 19946,100
396573-99DrillMitchell Energy CorporationFeb 11, 1992Feb 13, 1992Sep 5, 19926,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 12, 1994Chandler-Davis Unit G-13-150854Boonsville (Bend Congl. Gas)BKV Barnett LLCProducing6,100
Sep 12, 1992Chandler-Davis Unit G-13-146740WildcatMitchell Energy CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 731 ft elevation.Download CSV →

FormationMD ftSubsea
Kenkirk3,736-3,005
Caddo4,711-3,980
Atoka5,491-4,760

Perforations

Perforated and open-hole intervals.

FromToType
4,7124,882Perforated
5,4265,669Perforated
5,8745,883Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536412.25250 S
4.56,0817.8751,007 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1995Nov 23, 1994—
00Oct 24, 1994Aug 15, 1994—
00Sep 12, 1994——
00Dec 13, 1993Aug 25, 1993Yes
00Oct 8, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49733707, documented in the API reference.