TEXAS · WELLS · WISE COUNTY · API 42-497-33837 · DISTRICT 7C
Flowers-Bilberry Unit No. 1 #8
Wise County · Morris (Consolidated Congl.) field · Temp Abandoned · Vertical
- Fields on the latest permit · any of 2
- Boonsville (Bend Congl., Gas) · Morris (Consolidated Congl.)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Flowers-Bilberry Unit NO. 1 #8 (API 42-497-33837) is a well in Wise County operated by Scout Energy Management LLC, completed February 16, 1994 and listed as temp abandoned on the RRC schedule, shut in December 1, 2025.
The RRC has issued one drilling permit (amended once), issued August 12, 1993, permitted to 5,745 ft.
It was permitted by Devon Energy Operating CO., L.P. and has since transferred to Scout Energy Management LLC on the wellbore schedule.
Completion filings report one formation top, including Atoka.
Its 2 leases have reported 3.93K barrels of oil and 323K mcf of gas since March 1994, last reporting volume in November 2025. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Devon Energy Operating Co., L.P.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 22, 2025
- Permits on file
- 483
- Phone
- (972) 277-1397
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Scout Energy Management LLC |
| Production reports | Scout Energy Management LLCthrough Nov 2025 |
| Latest permit | Devon Energy Operating Co., L.P.Aug 12, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,745
- total depth, ft
- 2
- permits on file
- Aug 12, 1993
- last permit issued
- Feb 16, 1994
- completed
- 3.93K
- cumulative oil, bbl
- 323K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · MAR 1994 THROUGH NOV 2025
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 16, 1994
- Shut in
- Dec 1, 2025
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flowers-Bilberry Unit No. 1 G-13-194019 | Morris (Consolidated Congl.) | Scout Energy Management LLC | 1 | 1.36K | 119K | Sep 2002 – Nov 2025 |
| C.C. McClure OU -C- O-13-28754 | Morris (Consolidated Congl.) | Devon Energy Production Co, L.P. | 1 | 2.56K | 204K | Mar 1994 – May 2002 |
Gas, mcf lease total
Last 12 months 276 · prior 12 2,498(-89%)
Wells named Flowers-Bilberry Unit No. 1
Scout Energy Management LLC's other wells filed under this lease name in Wise County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationMar 1994 → Nov 2000
- 2Mitchell Energy Company L.P.Feb 2001 → Mar 2002
- 3Devon Energy Operating Co., L.P.Apr 2002 → Jul 2004
- 4Devon Energy Production Co, L.P.Aug 2004 → Oct 2018
- 5Scout Energy Management LLCNov 2018 → Nov 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 414724-98 | Drill | Devon Energy Operating Co., L.P. | Aug 28, 2002 | Aug 12, 1993 | — | 5,745 |
| 414724-99 | Drill | Mitchell Energy Corporation | Aug 9, 1993 | Aug 12, 1993 | Aug 30, 1993 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 16, 1994 | Flowers-Bilberry Unit No. 1 G-13-194019 | Morris (Consolidated Congl.) | Scout Energy Management LLC | Temp Abandoned · shut in Dec 1, 2025 | 5,745 |
| Feb 16, 1994 | C.C. McClure OU -C- O-13-28754 | Morris (Consolidated Congl.) | Devon Energy Production Co L.P. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 885 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,938 | 5,168 | Perforated |
| 5,455 | 5,495 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 549 | 12.25 | 350 S |
| 4.5 | 5,743 | 7.875 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 2003 | Nov 5, 2002 | — |
| 00 | Apr 30, 2003 | — | — |
| 00 | Dec 12, 1994 | Nov 14, 1994 | — |
| 00 | Apr 14, 1994 | Mar 28, 1994 | Yes |
| 00 | Apr 1, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-33837 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-33837 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49733837, documented in the API reference.