TEXAS · WELLS · WISE COUNTY · COZART, M. M. LEASE · API 42-497-34263 · DISTRICT 7C

Cozart M. M. #1

Shut in

Wise County · Boonsville (Bend Congl. Gas) field · Temp Abandoned  · Vertical

Cozart M. M. #1 (API 42-497-34263) is a well in Wise County operated by Texxol Operating Company Inc., completed August 21, 1998 and listed as temp abandoned on the RRC schedule, shut in April 1, 2024.

The RRC has issued one drilling permit, issued May 26, 1998, permitted to 6,125 ft.

It was permitted by Richey, Ray Management CO., Inc. and has since transferred to Texxol Operating Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Pregnant Shale, Caddo, Marble Falls.

Its lease has reported 5.4K barrels of oil and 1.36M mcf of gas since August 1998, last reporting volume in March 2024.

Operator of record

Texxol Operating Company Inc.

Permitted by Richey, Ray Management Co., Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
May 19, 2026
Permits on file
20
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexxol Operating Company Inc.
Production reportsTexxol Operating Company, Inc.through Mar 2024
Latest permitRichey, Ray Management Co., Inc.May 26, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,125
total depth, ft
1
permits on file
May 26, 1998
last permit issued
Aug 21, 1998
completed
5.4K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1998 THROUGH Mar 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 21, 1998
Shut in
Apr 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cozart, M. M. G-13-170316Boonsville (Bend Congl., Gas)Texxol Operating Company, Inc.15.4K1.36MAug 1998 – Mar 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Richey, Ray Management Co., Inc.Aug 1998 → Jul 2013
  2. 2Texxol Operating Company, Inc.Aug 2013 → Mar 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
476544-99DrillRichey, Ray Management Co., Inc.May 22, 1998May 26, 1998Jul 2, 19986,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 21, 1998Cozart M. M. G-13-170316Boonsville (Bend Congl. Gas)Texxol Operating Company Inc.Temp Abandoned · shut in Apr 1, 20246,125

Formation tops

As filed on W-2/G-1. Subsea from 920 ft elevation.Download CSV →

FormationMD ftSubsea
Pregnant Shale4,436-3,516
CaddoCADDO LIME5,350-4,430
Marble Falls6,105-5,185

Perforations

Perforated and open-hole intervals.

FromToType
5,7735,780Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62536812.25200 S
4.56,0927.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 3, 1998Sep 28, 1998Yes
00Oct 15, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49734263, documented in the API reference.