WELL · 42-497-34565 · DISTRICT 9
Cole, M. T. #3A
Wise County · Vertical
Cole, M. T. #3A (API 42-497-34565) is a permitted well in Wise County filed by Tejas Western Corp.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2000 and 2002, permitted to 9,000 ft.
Completion filings report 4 formation tops, including Marble Falls, Barnett, Forrestburg Lime, Viola.
Operator of record
- Based in
- Granbury, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 1, 2019
- Permits on file
- 178
- Phone
- (817) 279-9566
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | BKV Barnett II, LLCthrough Apr 2026 |
| Latest permit | Tejas Western Corp.Aug 28, 2002 |
- 9,000
- total depth, ft
- 2
- permits on file
- Aug 28, 2002
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 721K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cole, M. T. G-13-180009 | Newark, East (Barnett Shale) | BKV Barnett II, LLC | 1 | 0 | 721K | Oct 2000 – Jul 2026 |
Gas, mcf lease total
Last 12 months 15,228 · prior 12 16,942(-10%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tejas Western Corp.Dec 2000 → Oct 2003
- 2Encana Oil & Gas(usa) Inc.Nov 2003 → Dec 2011
- 3Enervest Operating, L.L.C.Jan 2012 → Jan 2019
- 4Bedrock Production, LLCFeb 2019 → Aug 2025
- 5BKV Barnett II, LLCSep 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 523205-99 | Recompletion | Tejas Western Corp. | Aug 28, 2002 | Aug 28, 2002 | — | 8,000 |
| 499863-99 | Drill | Tejas Western Corp. | Sep 20, 2000 | Sep 20, 2000 | Sep 22, 2000 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-180009 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 810 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble FallsMARBLE FALLS LIME | 7,150 | -6,340 |
| BarnettUPPER BARNETT SHALE | 7,438 | -6,628 |
| Forrestburg Lime | 7,482 | -6,672 |
| BarnettLOWER BARNETT SHALE | 7,826 | -7,016 |
| ViolaVIOLA LIME | 8,274 | -7,464 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,438 | 7,474 | Perforated |
| 7,831 | 8,150 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 768 | 12.25 | 390 S |
| 5.5 | 8,234 | 7.875 | 365 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 22, 2001 | Dec 8, 2000 | Yes |
| 00 | Dec 21, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-34565 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-34565 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49734565, documented in the API reference.