TEXAS · WELLS · WISE COUNTY · WAGGONER, CRYSTELLE GAS UNIT LEASE · API 42-497-34873 · DISTRICT 7C

Waggoner Crystelle Gas Unit #6B

Shut in

Wise County · Newark East (Barnett Shale) field · Producing  · Vertical

Waggoner Crystelle Gas Unit #6B (API 42-497-34873) is a well in Wise County operated by Hawkbend LLC, completed May 6, 2003 and listed as producing on the RRC schedule, shut in July 1, 2026.

The RRC has issued one drilling permit (amended once), issued February 6, 2002, permitted to 8,140 ft.

It was permitted by Burlington Resources O & G CO LP and has since transferred to Hawkbend LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Barnett, Viola.

Its lease has reported 4.47K barrels of oil and 477K mcf of gas since May 2003, last reporting volume in March 2026.

Operator of record

Hawkbend LLC

Permitted by Burlington Resources O & G Co LP; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Mar 20, 2026
Phone
(512) 484-3221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHawkbend LLC
Production reportsHawkbend LLCthrough Mar 2026
Latest permitBurlington Resources O & G Co LPFeb 6, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,140
total depth, ft
2
permits on file
Feb 6, 2002
last permit issued
May 6, 2003
completed
4.47K
cumulative oil, bbl
477K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 6, 2003
Shut in
Jul 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner, Crystelle Gas Unit G-13-195292Newark, East (Barnett Shale)Hawkbend LLC14.47K477KMay 2003 – Mar 2026

Gas, mcf lease total

Last 12 months 1,011 · prior 12 197

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burlington Resources O & G Co LPMay 2003 → Oct 2018
  2. 2Lime Rock Resources IV-a, L.P.Nov 2018 → Jan 2023
  3. 3Hawkbend LLCJan 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
517380-98DrillBurlington Resources O & G Co LPFeb 11, 2003Feb 6, 2002Mar 25, 20039,000
517380-99DrillBurlington Resources O & G Co LPFeb 5, 2002Feb 6, 2002—8,300

Completions

CompletedLeaseFieldOperatorStatusDepth
May 6, 2003Waggoner Crystelle Gas Unit G-13-195292Newark East (Barnett Shale)Hawkbend LLCProducing · shut in Jul 1, 20268,140

Formation tops

As filed on W-2/G-1. Subsea from 968 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo5,174-4,206
Barnett7,400-6,432
Viola8,068-7,100

Perforations

Perforated and open-hole intervals.

FromToType
8,0007,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62583512.25410 S
5.58,1407.875510 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 24, 2003Jun 13, 2003Yes
00Jul 9, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49734873, documented in the API reference.