TEXAS · WELLS · WISE COUNTY · INDIAN CREEK LEASE · API 42-497-35517 · DISTRICT 7C

Indian Creek #R 3

Shut in

Wise County · Newark East (Barnett Shale) field · Shut In  · Vertical

Indian Creek #R 3 (API 42-497-35517) is a well in Wise County operated by Bkv North Texas LLC, completed August 14, 2026 and listed as shut in on the RRC schedule, shut in June 1, 2026.

The RRC has issued one drilling permit, issued January 26, 2004, permitted to 7,233 ft.

It was permitted by Antero Resources I, LP and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Caddo, Top Nemesis, Marble Falls, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by Antero Resources I, LP; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Apr 2026
Latest permitAntero Resources I, LPJan 26, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,233
total depth, ft
1
permits on file
Jan 26, 2004
last permit issued
Aug 14, 2026
completed
0
cumulative oil, bbl
1.53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 14, 2026
Shut in
Jun 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Indian Creek G-13-201394Newark, East (Barnett Shale)BKV North Texas, LLC101.53MMar 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 23,320 · prior 12 24,411(-4%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Antero Resources I, LPApr 2004 → Jun 2005
  2. 2XTO Energy Inc.Jul 2005 → May 2022
  3. 3BKV North Texas, LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541182-99DrillAntero Resources I, LPJan 26, 2004Jan 26, 2004Mar 7, 20047,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 14, 2026Indian Creek G-13-201394Newark East (Barnett Shale)BKV North Texas LLCShut In · shut in Jun 1, 20267,233

Formation tops

As filed on W-2/G-1. Subsea from 773 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoUPPER CADDO LIME3,310-2,537
Top Nemesis6,030-5,257
Marble Falls6,465-5,692
BarnettUPPER BARNETT6,818-6,045
BarnettUPPER BARNETT SHALE6,818-6,045
Forrestburg6,878-6,105
BarnettLOWER BARNETT6,919-6,146
BarnettLOWER BARNETT6,919-6,146
BarnettLOWER BARNETT SHALE6,919-6,146
Viola7,103-6,330

Perforations

Perforated and open-hole intervals.

FromToType
6,8187,130Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62585012.25425 S
77,2308.75600 S
77,2608.75600 S
7—8.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 26, 2026Sep 21, 2026—
00Oct 23, 2026May 26, 2026—
00Jul 21, 2026May 6, 2026—
00Jul 15, 2004May 3, 2004Yes
00Jun 7, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49735517, documented in the API reference.