TEXAS · WELLS · WISE COUNTY · FOX LEASE · API 42-497-36633 · DISTRICT 7C

Fox #13H

Shut in

Wise County · Newark East (Barnett Shale) field · Producing  · Horizontal

Fox #13H (API 42-497-36633) is a horizontal well in Wise County operated by Lime Rock Resources IV-A L.P., completed January 15, 2009 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued September 24, 2008, permitted to 7,946 ft.

It was permitted by Burlington Resources O & G CO LP and has since transferred to Lime Rock Resources IV-A L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Marble Falls, Barnett, Forestburg.

Its lease has reported 15.9K barrels of oil and 1.95M mcf of gas since January 2009, last reporting volume in April 2026.

Operator of record

Lime Rock Resources IV-a L.P.

Permitted by Burlington Resources O & G Co LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2025
Permits on file
117
Phone
(713) 292-9510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLime Rock Resources IV-a L.P.
Production reportsLime Rock Resources IV-a, L.P.through Apr 2026
Latest permitBurlington Resources O & G Co LPSep 24, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,946
total depth, ft
1
permits on file
Sep 24, 2008
last permit issued
Jan 15, 2009
completed
15.9K
cumulative oil, bbl
1.95M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2009 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 15, 2009
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fox G-13-249966Newark, East (Barnett Shale)Lime Rock Resources IV-a, L.P.115.9K1.95MJan 2009 – Apr 2026

Gas, mcf lease total

Last 12 months 62,897 · prior 12 64,082(-2%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burlington Resources O & G Co LPFeb 2009 → Oct 2018
  2. 2Lime Rock Resources IV-a, L.P.Nov 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
670643-99DrillBurlington Resources O & G Co LPSep 5, 2008Sep 24, 2008Nov 7, 20089,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 15, 2009Fox G-13-249966Newark East (Barnett Shale)Lime Rock Resources IV-a L.P.Producing · shut in Aug 1, 20267,946

Formation tops

As filed on W-2/G-1. Subsea from 791 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls7,067-6,276
BarnettUPPER BARNETT7,405-6,614
Forestburg7,472-6,681

Perforations

Perforated and open-hole intervals.

FromToType
8,32012,574Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62589712.25340 S
712,7358.751,355 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 9, 2009Apr 2, 2009Yes
00Aug 8, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49736633, documented in the API reference.