TEXAS · WELLS · WOOD COUNTY · WRIGHT, STELLA LEASE · API 42-499-30381 · DISTRICT 06
Wright Stella #2
Wood County · Quitman (Hill) field · Vertical
Wright Stella #2 (API 42-499-30381) is a plugged well in Wood County, plugged August 4, 2015, last operated by Southwest Operating Inc.-Tyler.
The RRC has issued one drilling permit, issued July 1, 1977, permitted to 8,560 ft.
It was permitted by Clemco and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.
Completion filings report 6 formation tops, including Nacatoch, Pecan Gap, Goodland, Paluxy.
Its lease has reported 4.09K barrels of oil and 162K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Southwest Operating Inc.-Tyler
Permitted by Clemco; the EWA schedule now lists a different operator.
- Based in
- Tyler, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 4, 2026
- Permits on file
- 63
- Phone
- (903) 597-4279
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Southwest Operating, Inc.-Tylerthrough Aug 2006 |
| Latest permit | ClemcoJul 1, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,560
- total depth, ft
- 1
- permits on file
- Jul 1, 1977
- last permit issued
- Apr 11, 1984
- completed
- 4.09K
- cumulative oil, bbl
- 162K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 11, 1984
- Shut in
- —
- Plugged
- Aug 4, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wright, Stella O-6-11344 | Quitman (Hill) | Southwest Operating, Inc.-Tyler | 1 | 4.09K | 162K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Altair Energy Corp.Jan 1993 → Sep 1993
- 2Smal Energy CorpOct 1993 → Jul 1995
- 3Little & Whyte Operating, Inc.Aug 1995 → Jul 2002
- 4Southwest Operating, Inc.-TylerAug 2002 → May 2005
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 11, 1984 | Wright Stella O-6-11344 | Quitman (Hill) | Southwest Operating Inc.-Tyler | Plugged | — |
| Nov 21, 1977 | Wright Stella G-6-77081 | Quitman (Hill) | Clemco | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 454 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,080 | 8,150 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 764 | 11.25 | 450 sx |
| 5.5 | 8,560 | 7.875 | 300 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 1984 | Apr 20, 1984 | — |
| 00 | May 2, 1984 | Apr 20, 1984 | — |
| 00 | Jan 12, 1984 | Jun 16, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-30381 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-30381 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49930381, documented in the API reference.