WELL · 42-499-31979 · DISTRICT 6
Noe J. L. #3
Wood County · Manziel (Travis Peak) field · Producing · Vertical
Noe J. L. #3 (API 42-499-31979) is a well in Wood County operated by Southwest Operating Inc.-Tyler, completed October 15, 2002 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 16, 2001, permitted to 9,000 ft.
It was permitted by Fair Oil, Ltd. and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.
Completion filings report 6 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Paluxy.
No lease production has been reported under this well’s leases.
Operator of record
Southwest Operating Inc.-Tyler
Permitted by Fair Oil, Ltd.; the EWA schedule now lists a different operator.
- Based in
- Tyler, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 4, 2026
- Permits on file
- 63
- Phone
- (903) 597-4279
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Southwest Operating, Inc.-Tylerthrough Apr 2026 |
| Latest permit | Fair Oil, Ltd.Oct 16, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Oct 16, 2001
- last permit issued
- Oct 15, 2002
- completed
- 0
- cumulative oil, bbl
- 903K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 15, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Noe, J. L. G-6-192009 | Manziel (Travis Peak) | Southwest Operating, Inc.-Tyler | 1 | 0 | 903K | Oct 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,071 · prior 12 2,164(-4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fair Oil, Ltd.Oct 2002 → Jun 2022
- 2Southwest Operating, Inc.-TylerJul 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 514130-99 | Drill | Fair Oil, Ltd. | Oct 3, 2001 | Oct 16, 2001 | Aug 7, 2002 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-192009 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 464 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 2,556 | -2,092 |
| Austin Chalk | 3,870 | -3,406 |
| Woodbine | 4,310 | -3,846 |
| Paluxy | 6,236 | -5,772 |
| Rodessa | 8,150 | -7,686 |
| Travis Peak | 8,590 | -8,126 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,640 | 8,896 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 869 | 11 | 251 S |
| 5.5 | 9,027 | 7.875 | 1,186 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 3, 2003 | Dec 16, 2002 | Yes |
| 00 | Jan 7, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-31979 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-31979 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49931979, documented in the API reference.