TEXAS · WELLS · YOAKUM COUNTY · BENNETT RANCH UNIT LEASE · API 42-501-31471 · DISTRICT 7B
Bennett Ranch Unit #150-A
Yoakum County · Wasson field · Injection · Vertical
Bennett Ranch Unit #150-A (API 42-501-31471) is a well in Yoakum County operated by Occidental Permian Ltd., completed February 15, 2017 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued August 12, 1977, permitted to 5,275 ft.
It was permitted by Texas Pacific Oil Company, Inc. and has since transferred to Occidental Permian Ltd. on the wellbore schedule.
Completion filings report 2 formation tops, including Queen, San Andres.
Its lease has reported 50.7M barrels of oil and 51.7M mcf of gas since the record begins in January 1993, last reporting volume in August 2026. The lease carries 607 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 19.8K barrels injected in the 12 months reported through September 2025.
Operator of record
Permitted by Texas Pacific Oil Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 2, 2026
- Permits on file
- 6,251
- Phone
- (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Occidental Permian Ltd. |
| Production reports | Occidental Permian Ltd.through Apr 2026 |
| Latest permit | Texas Pacific Oil Company, Inc.Aug 12, 1977 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,275
- total depth, ft
- 1
- permits on file
- Aug 12, 1977
- last permit issued
- Feb 15, 2017
- completed
- 50.7M
- cumulative oil, bbl
- 51.7M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 15, 2017
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 607 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bennett Ranch Unit O-11-19151 | Wasson | Occidental Permian Ltd. | 607 | 50.7M | 51.7M | by Jan 1993 – Aug 2026 |
Oil, barrels lease total
Last 12 months 1,291,908 · prior 12 1,362,714(-5%)
Gas, mcf lease total
Last 12 months 1,101,712 · prior 12 1,406,269(-22%)
Wells named Bennett Ranch Unit
Occidental Permian Ltd.'s other wells filed under this lease name in Yoakum County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Frontier Oil & Gas Inc.Jan 1993 → Feb 1997
- 2Altura Energy Ltd.Mar 1997 → Apr 2000
- 3Occidental Permian Ltd.May 2000 → Aug 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 5302-99 | Drill | Texas Pacific Oil Company, Inc. | Aug 12, 1977 | Aug 12, 1977 | Aug 7, 1977 | 5,275 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 15, 2017 | Bennett Ranch Unit O-11-19151 | Wasson | Occidental Permian Ltd. | Injection | 5,275 |
| Sep 2, 1977 | Bennett Ranch Unit O-11-19151 | Wasson | Occidental Permian Ltd. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,557 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen | 3,953 | -396 |
| San Andres | 4,595 | -1,038 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,059 | 5,255 | Open hole |
| 5,070 | 5,162 | Perforated |
| 5,070 | 5,266 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 463 | 12.25 | 375 S |
| 4.5 | 5,275 | 7.875 | 2,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 25, 2022 | Mar 21, 2022 | — |
| 00 | Jan 29, 1990 | Dec 18, 1989 | — |
| 00 | Apr 22, 1986 | Feb 5, 1986 | — |
| 00 | Apr 9, 1986 | — | — |
| 00 | Jan 12, 1984 | Feb 5, 1986 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-501-31471 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-501-31471 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 19.8K
- bbl, last 12 reported months
- 4.83M
- bbl, all reported
- Sep 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000029155 | H-1 Injection | Active | 4,500 | 2,200 | 4,700–5,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 19,800 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50131471, documented in the API reference.