TEXAS · WELLS · YOAKUM COUNTY · API 42-501-31594 · DISTRICT 7B

Brownfield #1

Plugged

Yoakum County · Wasson field  · Vertical

Brownfield #1 (API 42-501-31594) is a plugged well in Yoakum County, plugged March 18, 1988, last operated by Cholla Petroleum Inc..

The RRC has issued one drilling permit, issued May 17, 1978, permitted to 5,500 ft.

It was permitted by Melton, Joe, Drlg. CO., Inc. and has since transferred to Cholla Petroleum Inc. on the wellbore schedule.

Operator of record

Cholla Petroleum Inc.

Permitted by Melton, Joe, Drlg. Co., Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Mar 23, 2026
Permits on file
1,085
Phone
(214) 692-7052

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCholla Petroleum Inc.
Production reportsnone
Latest permitMelton, Joe, Drlg. Co., Inc.May 17, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
May 17, 1978
last permit issued
Sep 15, 1978
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 15, 1978
Shut in
—
Plugged
Mar 18, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
24439-99DrillMelton, Joe, Drlg. Co., Inc.May 17, 1978May 17, 1978Jul 11, 19785,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 15, 1978Brownfield O-11-62283WassonCholla Petroleum Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
—5,385Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625460—285 S
4.55,498—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Sep 28, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50131594, documented in the API reference.